Miami-Dade County Public Schools, Facilitron Partner for Facility Management

Miami-Dade County Public Schools (MDCPS) recently announced a partnership with facility management systems provider Facilitron, according to a news release. MDCPS has about 350,000 students across 400 campuses and is the 19th Florida school district to use Facilitron’s platform. The service empowers school district to manage spaces more efficiently—including rentals, events, and building operations—improve campus safety, and boost community engagement.

“Our partnership with Miami-Dade County Public Schools is a significant milestone in our mission to help districts manage their spaces safely and efficiently,” said Facilitron CEO Jeff Benjamin. “By streamlining facility use, improving community engagement, and reinforcing safety measures, we’re proud to support MDCPS in their commitment to delivering an excellent educational experience while fostering strong ties with the local community.”

The platform allows districts to streamline their operations, reduce administrative workloads, and ensure the safety and accessibility of facilities. Features include comprehensive facility scheduling for both school events and community rentals; safety and security capabilities like people tracking; revenue generation via renting out school facilities like auditoriums, fields, and gymnasiums; and automation and maintenance tools for automated invoicing, insurance verification, payment collections, and preventative maintenance and work-order management.

“We’re thrilled to welcome Miami-Dade County Public Schools into the Facilitron family,” said Cheryl Galloway, Facilitron’s Director of Community Engagement. “Their commitment to both safety and community engagement makes this partnership a perfect fit. With Facilitron, MDCPS will streamline their facility use management, optimize space utilization, and strengthen community relationships.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.