Case Systems Launches Line of K–12 Learning Spaces Installations

Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

The line includes mobile storage cabinets, 3D printer carts, maker tables, and wall-mount panel systems. Unique design features include recessed pegboards and side panels for storage that are also dash-patterned to offer compatibility with a variety of hooks. Movable furniture features sinusoidal split wheels to allow easy moving across carpet and concrete. Finally, the integration of fixed and mobile storage integration creates a transformable but clutter-free learning environment.

"Our goal is to create a space that transitions effortlessly to meet the needs of every student and teacher. SALTO makes that vision a reality,” said Kelly Wehner, Case Systems President. “SALTO is an education-first brand that flips the script on traditional classrooms, delivering multi-purpose furniture and storage solutions that put the fun in functional. We designed SALTO based on the real needs of teachers and students, creating classrooms that support more learning, fewer limits, and better experiences for everyone.”

According to the news release, key benefits of the product line include easy adaptability for project-based learning, providing the potential for on-the-fly layout changes, and increased creativity in maker spaces by keeping all tools and materials within close reach.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Western Kentucky University, Gilbane Announce “Elevate WKU” Partnership

    Western Kentucky University in Bowling Green, Ky., recently announced that it has reached the financial close on a on a public-private partnership (P3) with Gilbane Development, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.