Case Systems Launches Line of K–12 Learning Spaces Installations

Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

The line includes mobile storage cabinets, 3D printer carts, maker tables, and wall-mount panel systems. Unique design features include recessed pegboards and side panels for storage that are also dash-patterned to offer compatibility with a variety of hooks. Movable furniture features sinusoidal split wheels to allow easy moving across carpet and concrete. Finally, the integration of fixed and mobile storage integration creates a transformable but clutter-free learning environment.

"Our goal is to create a space that transitions effortlessly to meet the needs of every student and teacher. SALTO makes that vision a reality,” said Kelly Wehner, Case Systems President. “SALTO is an education-first brand that flips the script on traditional classrooms, delivering multi-purpose furniture and storage solutions that put the fun in functional. We designed SALTO based on the real needs of teachers and students, creating classrooms that support more learning, fewer limits, and better experiences for everyone.”

According to the news release, key benefits of the product line include easy adaptability for project-based learning, providing the potential for on-the-fly layout changes, and increased creativity in maker spaces by keeping all tools and materials within close reach.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

Digital Edition