Case Systems Launches Line of K–12 Learning Spaces Installations

Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

The line includes mobile storage cabinets, 3D printer carts, maker tables, and wall-mount panel systems. Unique design features include recessed pegboards and side panels for storage that are also dash-patterned to offer compatibility with a variety of hooks. Movable furniture features sinusoidal split wheels to allow easy moving across carpet and concrete. Finally, the integration of fixed and mobile storage integration creates a transformable but clutter-free learning environment.

"Our goal is to create a space that transitions effortlessly to meet the needs of every student and teacher. SALTO makes that vision a reality,” said Kelly Wehner, Case Systems President. “SALTO is an education-first brand that flips the script on traditional classrooms, delivering multi-purpose furniture and storage solutions that put the fun in functional. We designed SALTO based on the real needs of teachers and students, creating classrooms that support more learning, fewer limits, and better experiences for everyone.”

According to the news release, key benefits of the product line include easy adaptability for project-based learning, providing the potential for on-the-fly layout changes, and increased creativity in maker spaces by keeping all tools and materials within close reach.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition