California District Opens New K–8 School

The Chino Valley Unified School District in Chino, Calif., recently announced that construction is complete on the new Legacy Academy K–8 School, according to a news release. The $51-million, 73,000-square-foot facility has the capacity for about 1,250 students from The Preserve at Chino, a master-planned residential community in San Bernadino County.

The district partnered with PBK Architects for the project’s design and builder C.W. Driver for its construction, which began in November 2022. The campus includes six one-story buildings with amenities like classrooms, STEM and science labs, administrative space, a multipurpose room, physical education facilities, a library, and an outdoor amphitheater, the news release reports.

“The new Legacy Academy school will help immensely in relieving the needs of Chino Valley Unified School District’s student overcrowding at The Preserve,” said C.W. Driver Companies project executive John Kately. “It is a welcome addition to the neighborhood with its state-of-the-art classrooms and multiple specialty facilities.”

According to the news release, C.W. Driver has previously partnered with Chino Valley USD  on projects like the modernization of Ayala and Don Lugo High Schools, as well as ten other elementary and junior high schools around the district.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Electrifying Bus Fleets

    Now is an excellent time for K-12 “yellow” school buses, college campus transportation, and public transit systems to transition to zero-emission electric buses instead of traditional gas or diesel-powered models.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • zSpace Imagine Learning Solution

    zSpace Introduces Headset-Free AR/VR System

    Immersive learning company zSpace has debuted the zSpace Imagine Learning Solution, a headset-free AR/VR laptop system designed for elementary education. The all-in-one platform integrates hardware, software, and hands-on lessons to create dynamic learning experiences for young students.