Greenheck Debuts New Energy Recovery Ventilator

Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects. The unit provides both right-hand and left-hand access, as well as the ability to discharge at either end.

The unit comes in two models. “The ERVi-10 discharges 375–1,500 cfm with a maximum height of 18 inches, while the ERVi-20 discharges 750–2,500 cfm with a maximum height of 23 inches,” the news release reports.

Among the ERVi’s optional features are factory-installed, low-leakage dampers; MERV-13 filters, frost and economizer controls, and downstream heating and cooling controls. Every unit contains a 3-inch polymer enthalpy wheel, electric motor, factory controls with a DDC microprocessor, and a direct drive fan.

More information is available on the Greenheck website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.