Minnesota High School Completes $226M Addition, Renovation Project

White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District. Construction started in June 2021.

The school measures in at 595,000 square feet, including a 250,000-square-foot addition featuring new classrooms, a performing arts center, and an athletic facility. The project also entailed 216,000 square feet of renovations to existing academic space and the media center, as well as security upgrades and expansions to the existing student union and gym, the news release reports.

Funding for the project came through a 2019, $326-million school bond referendum including 16 total projects around the district. According to the news release, completed projects include the new Mariner Middle School, North Star Elementary, Area Learning Center, District Services Center, Central Middle School, and a Transportation Facility.

The project’s ultimate goal is to address building maintenance and district enrollment growth, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Average Annual Number of Tornadoes per State

    New Tornado Wind Load Design Criteria in IBC Offer Improvements to Life Safety

    For the first time in U.S. building code history, the 2024 International Building Code (IBC) includes tornado wind load design criteria, marking a significant advancement in life-safety provisions.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition