Fellowes Launches New Textile Collection

Fellowes Contract Interiors recently partnered with Momentum Textiles & Wallcoverings to launch a new line of high-end-design, cost-effective textiles, according to a news release. Part of Momentum Textiles’ Kickstart collection, the new selection offers high-quality and versatile textiles for both smaller budgets and the early design phase of larger projects. The Momentum Collection was designed for use in environments that use Fellowes’ Volo monolithic and frame & tile modular walls.

“Momentum and Fellowes have a longstanding partnership spanning several decades,” said Kris Ward, Vice President of Alliance Programs at Momentum. “We are excited to partner with an industry leader on this latest launch of beautiful, sustainable textiles, providing inspiration for your next workspace project.”

The collection features five patterns with crepe, basketweave, and woven textures with both solid and two-tone colorways, heathered fabric, and dynamic patterns. The fabrics provide a way to add warmth, texture, and color to any space, the news release reports. The fabrics are high-performance and made from recycled content.

“At Fellowes Contract Interiors, we see ourselves as partners to both contract dealers and designers, so it’s important that our products are made to bring strong design and trusted material partnerships to our mutual clients,” said Todd Holderness, General Manager at Fellowes. “Pairing this selection from Momentum Textiles with Volo creates a sustainable solution with high performance, beautiful design, and maximum flexibility.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.