California High School Debuts $35M Performing Arts Center

Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet. Construction began in January 2023, and the grand opening celebration took place on Feb. 7, 2025.

Amenities include a 650-seat main theater with upgraded sound, lighting, and rigging capabilities; a black box theater; dressing rooms; a scene shop; and central lobby, the news release reports.

“We have envisioned this facility for years, and it’s truly exciting to see it come to life,” said Kelvin Okino, Irvine Unified School District’s Executive Director of Facilities and Construction. “Through the voter’s passage of Bond Measure E, we were able to construct a new state-of-the art Performing Arts Center. The success of the project is a testament to the incredible collaboration and partnership we’ve had with C.W. Driver Companies throughout this process. Together, we’ve created a space that will empower creativity and serve our community for generations to come.”

Materials used include a steel and metal frame diaphragm building and a combination of metal panels, plaster, and curtain walls, according to the news release. The construction process incorporated sustainability techniques like irrigation, deep soil mixing, and landscape planning. The facility will play home to a wide range of student performances, rehearsals, and school events.

“We are honored to have worked on such a world-class performing arts center, which will serve as a beacon of creativity and collaboration for students throughout the district and the Irvine greater community,” said C.W. Driver Companies Project Manager Ashcon Hekmat.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.