California High School Debuts $35M Performing Arts Center

Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet. Construction began in January 2023, and the grand opening celebration took place on Feb. 7, 2025.

Amenities include a 650-seat main theater with upgraded sound, lighting, and rigging capabilities; a black box theater; dressing rooms; a scene shop; and central lobby, the news release reports.

“We have envisioned this facility for years, and it’s truly exciting to see it come to life,” said Kelvin Okino, Irvine Unified School District’s Executive Director of Facilities and Construction. “Through the voter’s passage of Bond Measure E, we were able to construct a new state-of-the art Performing Arts Center. The success of the project is a testament to the incredible collaboration and partnership we’ve had with C.W. Driver Companies throughout this process. Together, we’ve created a space that will empower creativity and serve our community for generations to come.”

Materials used include a steel and metal frame diaphragm building and a combination of metal panels, plaster, and curtain walls, according to the news release. The construction process incorporated sustainability techniques like irrigation, deep soil mixing, and landscape planning. The facility will play home to a wide range of student performances, rehearsals, and school events.

“We are honored to have worked on such a world-class performing arts center, which will serve as a beacon of creativity and collaboration for students throughout the district and the Irvine greater community,” said C.W. Driver Companies Project Manager Ashcon Hekmat.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

Digital Edition