California High School Debuts $35M Performing Arts Center

Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet. Construction began in January 2023, and the grand opening celebration took place on Feb. 7, 2025.

Amenities include a 650-seat main theater with upgraded sound, lighting, and rigging capabilities; a black box theater; dressing rooms; a scene shop; and central lobby, the news release reports.

“We have envisioned this facility for years, and it’s truly exciting to see it come to life,” said Kelvin Okino, Irvine Unified School District’s Executive Director of Facilities and Construction. “Through the voter’s passage of Bond Measure E, we were able to construct a new state-of-the art Performing Arts Center. The success of the project is a testament to the incredible collaboration and partnership we’ve had with C.W. Driver Companies throughout this process. Together, we’ve created a space that will empower creativity and serve our community for generations to come.”

Materials used include a steel and metal frame diaphragm building and a combination of metal panels, plaster, and curtain walls, according to the news release. The construction process incorporated sustainability techniques like irrigation, deep soil mixing, and landscape planning. The facility will play home to a wide range of student performances, rehearsals, and school events.

“We are honored to have worked on such a world-class performing arts center, which will serve as a beacon of creativity and collaboration for students throughout the district and the Irvine greater community,” said C.W. Driver Companies Project Manager Ashcon Hekmat.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.