California High School Debuts $35M Performing Arts Center

Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet. Construction began in January 2023, and the grand opening celebration took place on Feb. 7, 2025.

Amenities include a 650-seat main theater with upgraded sound, lighting, and rigging capabilities; a black box theater; dressing rooms; a scene shop; and central lobby, the news release reports.

“We have envisioned this facility for years, and it’s truly exciting to see it come to life,” said Kelvin Okino, Irvine Unified School District’s Executive Director of Facilities and Construction. “Through the voter’s passage of Bond Measure E, we were able to construct a new state-of-the art Performing Arts Center. The success of the project is a testament to the incredible collaboration and partnership we’ve had with C.W. Driver Companies throughout this process. Together, we’ve created a space that will empower creativity and serve our community for generations to come.”

Materials used include a steel and metal frame diaphragm building and a combination of metal panels, plaster, and curtain walls, according to the news release. The construction process incorporated sustainability techniques like irrigation, deep soil mixing, and landscape planning. The facility will play home to a wide range of student performances, rehearsals, and school events.

“We are honored to have worked on such a world-class performing arts center, which will serve as a beacon of creativity and collaboration for students throughout the district and the Irvine greater community,” said C.W. Driver Companies Project Manager Ashcon Hekmat.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

Digital Edition