UC Riverside Completes $285M, Multi-School Student Housing Development

The University of California, Riverside, recently announced the completion of a $285-million student housing complex offering 1,568 beds across 429 units, according to a news release. The university partnered with McCarthy Building Companies, Inc., designer Solomon Cordwell Buenz (SCB), and the Riverside Community College District (RCCD) to deliver the full project within a year and nine months.

The 424,000-square-foot facility is located on UCR’s main campus and, according to the news release, is the “first completed public intersegmental housing project in the country, providing affordable student housing for both UCR and RCCD students.” The approach allows RCCD students access to the four-year campus’ amenities and support services, an arrangement intended to promote student wellness.

“This project represents a breakthrough in how we think about access to housing and education,” said McCarthy Vice President Sarah Carr. “By delivering high-quality, affordable housing in record time, we’re helping to expand opportunities for students across the region and creating a replicable model for institutions nationwide.”

McCarthy used prefabricated cold-formed steel (CFS) wall and floor panels manufactured off-site and delivered immediately before installation. The process allowed production rates of as much as 18,000 square feet per week to accelerate the construction timeline.

The building stands seven stories and offers single- and double-occupancy rooms, each containing kitchens, living rooms, and in-unit AC and WiFi, the news release reports. Other amenities include study lounges, a fitness center, a café and market, outdoor courtyards, and sports fields.

“The North District 2 project, with its monumental pedestrian loggia, was always envisioned as both a literal and symbolic gateway to the UCR campus,” said SCB Principal Tim Stevens. “It is especially meaningful as a welcoming threshold for RCCD transfer students, embodying the spirit of an intersegmental campus community. By embracing a higher-density residential model, UCR not only advances affordability but also creates an inclusive, supportive environment that enriches the student experience and strengthens connections.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • Embry-Riddle Breaks Ground on New Office Building

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced that construction has begun on a new office building for its campus Research Park, according to a news release. The university partnered with Hoar Construction on the 34,740-square-foot Center for Aerospace Technology II (CAT II), which will be used for research and lab purposes.

  • Texas A&M Breaks Ground on Campus Visitor Center

    Texas A&M University in College Station, Texas, recently held a groundbreaking ceremony for a new campus learning hub and visitor center, according to a news release. The 211,000-square-foot Aplin Center will stand three stories and is scheduled to open to students in 2028.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.