Texas State University Completes Stadium Renovations

Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house. The university partnered with Pfluger Architects and White Construction on the project.

Field house upgrades include the addition of an 8,000-square-foot weight room and a 3,000-square-foot training room. The new End Zone Complex features amenities for player wellness and development including in-ground hydrotherapy, cold-plunge pools, locker room upgrades, and meeting spaces, the news release reports.

“The university’s vision to have a facility to help student-athletes reach their full potential drove our design, putting player and team wellness at the forefront,” said Pfluger Architects’ Chris Lammers, AIA, project manager and Higher Education Practice Director. “Everything in the space planning, design, and programmatic needs was driven by efficiency and maximizing every minute to make Texas State’s players better athletes. We designed the stadium addition to fit seamlessly into the rest of campus and the existing stadium, unifying elements across the board.”

Other facility features include a players’ lounge, lobby and community area, and a hospitality suite that opens onto a rooftop terrace overlooking the stadium. A new Grand Central hallway connects the complex to other stadium facilities, while an expanded concourse bridge connects the terrace to the rest of the facility.

The project began in 2020 and was completed at the beginning of the fall 2025 semester, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Recent University of Pennsylvania Projects Receive LEED Certifications

    The University of Pennsylvania in Philadelphia, Penn., recently announced that three of its recent construction projects have earned LEED certifications, according to university news. The Vagelos Laboratory for Energy Science and Technology (VLEST) received a LEED Platinum certification, Amy Gutmann Hall a LEED Gold, and the OTT Center for Track and Field a LEED silver.

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

Digital Edition