Construction
The construction industry is bringing real-time information into centuries-old processes. Internet of Things (IoT) devices and sensors can collect job-site data in affordable, efficient, and effective ways, improving efficiency and safety.
STEM & STEAM
Groton Junior-Senior High School’s former dingy basement has transformed into a brightly lit $4.8 million STEAM lab and shared-learning space. The 8,000-square foot renovated space officially opens Sept. 4 for district-wide use following a soft-opening in December 2018.
- By Yvonne Marquez
- 09/03/19
New School Construction
The new high school will feature state-of-the-art science labs, a metal shop with 10 welding stations and an industrial tech shop with small engine and small projects space.
- By Yvonne Marquez
- 09/03/19
Safety & Security
Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.
- By Yvonne Marquez
- 09/03/19
New School Construction
The $85 million neighborhood school is brightly lit, with lots of windows and features colorful murals and inspirational words on the walls that integrates STEM symbols with traditional West African art patterns.
- By Yvonne Marquez
- 09/03/19
Construction Methods
In recent years, the International Building Code has mandated that all new construction for K–12 schools in most of the Midwest and South Central United States include a community storm shelter. This article will explain the requirements of storm shelter design and explore best practices for planning and construction.
- By Matthew H. Johnson, Andrea La Greca, Connor J. Bruns
- 09/01/19
Building Blueprints (Facilities in Focus)
- By John Gladden, Brandon Biniker
- 09/01/19
Editor's Note (The View From Here)
- By Shannon O'Connor
- 09/01/19
Facility Focus (Makerspaces)
Facilities (Campus Spaces)
Students need space and time for quiet study, reflection, mediation, and stillness. Here’s a look at what goes into the design of quiet spaces in order to make them both welcoming and effective.
Ask the Expert (Office Automation)
Case Histories (Real-World Solutions)
How Interface LVT brought peace of mind to the Reading Friends school building
Facility Focus (Makerspaces)
Facilities (Campus Spaces)
Modular buildings on college and university campuses rise up here, move over there and, when necessary, just disappear.
- By Michael Fickes
- 09/01/19
Facilities (Campus Spaces)
Autumn is the ideal time to prepare structures for winter from roof to foundation. Undertaking routine inspections in the fall can prevent costly repairs in the future.
- By Teddy Williams
- 09/01/19