A Renovation Alternative

Like thousands of districts around the country, Merrill Community Schools, a district that serves over 800 students in Saginaw County, MI, faced tight budgets, inefficient building systems, and rising energy costs. But although the district wanted to make infrastructure improvements and cut its utility bills, it didn’t want to place an additional burden on the community. With no money to allocate to building renovations, the district started to search for alternative methods to tackle its facility and energy concerns.

Inevitable Changes
“We had 25-year-old technology with inefficient and failing heating systems,” said John Searles, superintendent of Merrill Community Schools. “Classrooms would be 85 degrees in the winter and doors would be open. We were literally paying to heat the outside.”

Combined with a leaky roof at the high school and recurring maintenance needs at the district’s other facilities, upgrades and renovations were essential. A 30 to 40 percent increase in utility prices also sparked an interest in looking at creative, renewable technology.

Merrill Community Schools chose Honeywell to help provide insight and solutions for their needs. The resulting project was made possible by an energy conservation improvement bond from the Michigan Municipal Bond Authority, which allows schools to implement performance contracts and provides the initial capital for improvement projects.

The district will save $1.4M in energy and operational costs because of the improvements. The company guarantees the energy savings will pay for the upgrades over the term of the 15-year contract, so the project will not affect the district’s operating budget.

Unique Upgrades
Based on the district’s desire for a renewable component, Honeywell installed a corn-burning boiler to heat the district’s middle school by turning bushels of corn into usable energy. The school is the first school in Michigan — and one of the first in the nation — to use this alternative fuel technology as its main source of heat.

The boiler, powered by 7,200 bushels of corn each year, will decrease the district’s reliance on fossil fuels and is expected to reduce annual energy costs by $10,000, a significant increase over the projected $2,000 the district would have saved with a new, traditional gas boiler.

Other renewable energy work includes the addition of a waste oil heater in the maintenance building, which will help the district realize more than $2,000 in annual energy savings. The heater will run on waste oil collected from the district bus garage, further decreasing the district’s reliance on natural gas.

Another significant project was upgrading the district’s existing control system to a facility management platform that integrates HVAC, security, life safety, and other core building functions. Through that system, the district can monitor and control individual pieces of HVAC equipment across the district from a single workspace.

In addition, the system immediately notifies facility personnel of any abnormality, such as a downed boiler or a classroom that becomes too hot, allowing the district to better deal with issues as they arise.

Honeywell also helped the district lower energy consumption and increase savings by:
  • installing energy-efficient lighting with occupancy sensors in all district buildings;
  • performing boiler tune-ups to ensure optimal performance; and
  • installing a new roof on the high school.



Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.