A Renovation Alternative

Like thousands of districts around the country, Merrill Community Schools, a district that serves over 800 students in Saginaw County, MI, faced tight budgets, inefficient building systems, and rising energy costs. But although the district wanted to make infrastructure improvements and cut its utility bills, it didn’t want to place an additional burden on the community. With no money to allocate to building renovations, the district started to search for alternative methods to tackle its facility and energy concerns.

Inevitable Changes
“We had 25-year-old technology with inefficient and failing heating systems,” said John Searles, superintendent of Merrill Community Schools. “Classrooms would be 85 degrees in the winter and doors would be open. We were literally paying to heat the outside.”

Combined with a leaky roof at the high school and recurring maintenance needs at the district’s other facilities, upgrades and renovations were essential. A 30 to 40 percent increase in utility prices also sparked an interest in looking at creative, renewable technology.

Merrill Community Schools chose Honeywell to help provide insight and solutions for their needs. The resulting project was made possible by an energy conservation improvement bond from the Michigan Municipal Bond Authority, which allows schools to implement performance contracts and provides the initial capital for improvement projects.

The district will save $1.4M in energy and operational costs because of the improvements. The company guarantees the energy savings will pay for the upgrades over the term of the 15-year contract, so the project will not affect the district’s operating budget.

Unique Upgrades
Based on the district’s desire for a renewable component, Honeywell installed a corn-burning boiler to heat the district’s middle school by turning bushels of corn into usable energy. The school is the first school in Michigan — and one of the first in the nation — to use this alternative fuel technology as its main source of heat.

The boiler, powered by 7,200 bushels of corn each year, will decrease the district’s reliance on fossil fuels and is expected to reduce annual energy costs by $10,000, a significant increase over the projected $2,000 the district would have saved with a new, traditional gas boiler.

Other renewable energy work includes the addition of a waste oil heater in the maintenance building, which will help the district realize more than $2,000 in annual energy savings. The heater will run on waste oil collected from the district bus garage, further decreasing the district’s reliance on natural gas.

Another significant project was upgrading the district’s existing control system to a facility management platform that integrates HVAC, security, life safety, and other core building functions. Through that system, the district can monitor and control individual pieces of HVAC equipment across the district from a single workspace.

In addition, the system immediately notifies facility personnel of any abnormality, such as a downed boiler or a classroom that becomes too hot, allowing the district to better deal with issues as they arise.

Honeywell also helped the district lower energy consumption and increase savings by:
  • installing energy-efficient lighting with occupancy sensors in all district buildings;
  • performing boiler tune-ups to ensure optimal performance; and
  • installing a new roof on the high school.



Featured

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.