A Renovation Alternative

Like thousands of districts around the country, Merrill Community Schools, a district that serves over 800 students in Saginaw County, MI, faced tight budgets, inefficient building systems, and rising energy costs. But although the district wanted to make infrastructure improvements and cut its utility bills, it didn’t want to place an additional burden on the community. With no money to allocate to building renovations, the district started to search for alternative methods to tackle its facility and energy concerns.

Inevitable Changes
“We had 25-year-old technology with inefficient and failing heating systems,” said John Searles, superintendent of Merrill Community Schools. “Classrooms would be 85 degrees in the winter and doors would be open. We were literally paying to heat the outside.”

Combined with a leaky roof at the high school and recurring maintenance needs at the district’s other facilities, upgrades and renovations were essential. A 30 to 40 percent increase in utility prices also sparked an interest in looking at creative, renewable technology.

Merrill Community Schools chose Honeywell to help provide insight and solutions for their needs. The resulting project was made possible by an energy conservation improvement bond from the Michigan Municipal Bond Authority, which allows schools to implement performance contracts and provides the initial capital for improvement projects.

The district will save $1.4M in energy and operational costs because of the improvements. The company guarantees the energy savings will pay for the upgrades over the term of the 15-year contract, so the project will not affect the district’s operating budget.

Unique Upgrades
Based on the district’s desire for a renewable component, Honeywell installed a corn-burning boiler to heat the district’s middle school by turning bushels of corn into usable energy. The school is the first school in Michigan — and one of the first in the nation — to use this alternative fuel technology as its main source of heat.

The boiler, powered by 7,200 bushels of corn each year, will decrease the district’s reliance on fossil fuels and is expected to reduce annual energy costs by $10,000, a significant increase over the projected $2,000 the district would have saved with a new, traditional gas boiler.

Other renewable energy work includes the addition of a waste oil heater in the maintenance building, which will help the district realize more than $2,000 in annual energy savings. The heater will run on waste oil collected from the district bus garage, further decreasing the district’s reliance on natural gas.

Another significant project was upgrading the district’s existing control system to a facility management platform that integrates HVAC, security, life safety, and other core building functions. Through that system, the district can monitor and control individual pieces of HVAC equipment across the district from a single workspace.

In addition, the system immediately notifies facility personnel of any abnormality, such as a downed boiler or a classroom that becomes too hot, allowing the district to better deal with issues as they arise.

Honeywell also helped the district lower energy consumption and increase savings by:
  • installing energy-efficient lighting with occupancy sensors in all district buildings;
  • performing boiler tune-ups to ensure optimal performance; and
  • installing a new roof on the high school.



Featured

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.