The Impossible Made Possible

Sponsored content by VICTOR STANLEY, INC.

Since the introduction of our model NRBI-225 and NRBO-225 curved benches, we have been receiving frequent requests asking for custom continuous seating in varying configurations, lengths and mixed radii. Having perfected meeting these design requirements with our backless FRB benches, we set out to solve the complicated engineering, tooling and design challenges for producing custom radii NRB style continuous seating with backs. We are very proud to announce that we made what we thought was impossible, possible.

Comfort was a big challenge in producing these benches, given the compound angles and the need to keep the seat pitched using our traditional contour, rather than the easier, less comfortable and far less elegant seating which some offer using horizontal seats with no pitch. The pitched seat and back required breakthrough innovations in fixture and tooling design coupled with computer communications between machines, resulting in great flexibility and enormous value.

Imagine the complexity of positioning an array of formed steel ribbons in an everadjustable sweep of radii, while maintaining the pitch and comfort of a contoured seating surface. Now imagine incorporating sufficient precision to hold, maintain and weld dozens of such pieces. We can now do benches in fixed radii, concentric radii, even the classic moving elegance of the French curve. And, because of the investment in tooling and technology, we can do all this cost-effectively, flexibly and quickly. It’s just another way Victor Stanley helps you create the perfect setting for timeless moments.

This article originally appeared in the issue of .

Featured

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.