The Impossible Made Possible

Sponsored content by VICTOR STANLEY, INC.

Since the introduction of our model NRBI-225 and NRBO-225 curved benches, we have been receiving frequent requests asking for custom continuous seating in varying configurations, lengths and mixed radii. Having perfected meeting these design requirements with our backless FRB benches, we set out to solve the complicated engineering, tooling and design challenges for producing custom radii NRB style continuous seating with backs. We are very proud to announce that we made what we thought was impossible, possible.

Comfort was a big challenge in producing these benches, given the compound angles and the need to keep the seat pitched using our traditional contour, rather than the easier, less comfortable and far less elegant seating which some offer using horizontal seats with no pitch. The pitched seat and back required breakthrough innovations in fixture and tooling design coupled with computer communications between machines, resulting in great flexibility and enormous value.

Imagine the complexity of positioning an array of formed steel ribbons in an everadjustable sweep of radii, while maintaining the pitch and comfort of a contoured seating surface. Now imagine incorporating sufficient precision to hold, maintain and weld dozens of such pieces. We can now do benches in fixed radii, concentric radii, even the classic moving elegance of the French curve. And, because of the investment in tooling and technology, we can do all this cost-effectively, flexibly and quickly. It’s just another way Victor Stanley helps you create the perfect setting for timeless moments.

This article originally appeared in the issue of .

Featured

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • University of Illinois Moves Forward with College Sports’ Largest Digital Scoreboard

    The University of Illinois in Champaign, Ill., recently announced a series of upgrades to Gies Memorial Stadium that will include the largest scoreboard in college sports, according to a news release.

Digital Edition