Never Get Called on the Carpet

Sponsored content by L&M CONSTRUCTION CHEMICALS

At least thousands. Maybe hundreds of thousands. That’s what you’ll save with an FGS/PermaShine polished concrete floor. The explanation is really pretty simple. FGS/PermaShine floors don’t scuff, scratch, peel, chip, mark or any of the other things that mess up any other kind of floor.

Why? Because unlike other floors, FGS/PermaShine floors aren’t just thin coatings or wax. The beauty of PermaShine is built right into the concrete, so it never wears off and it never wears out. That means you’re saving money from day one and your savings will continue to grow for years.

FGS/PermaShine polished concrete floors don’t really need a lot of care. Sweep them, wash them, use them. That’s it. Really. Nothing to replace, no stripping and no high maintenance costs. Ever.

This just might be the best part. The FGS/PermaShine system works just as well on an old floor as it does a new one. We’ve restored floors that were over 100 years old. Compare FGS/PermaShine restoration to replacement costs and you’re in for a very nice surprise.

FGS/PermaShine floors are GreenSpec certified and contribute to LEED points for their sustainability and environmental advantages. (Ask about our FREE Guide to Polished Concrete and LEED.)

FGS/PermaShine floors aren’t slippery, despite their shiny appearance. In fact, The National Floor Safety Institute (NFSI) certified FGS/PermaShine as “High Traction” floors.

Take the next step to a beautiful concrete floor. Call us for a FREE Concrete Color Guide and the full report on all the advantages of FGS/PermaShine.

This article originally appeared in the issue of .

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition