EPA Kicks Off Campus RainWorks Challenge to Develop Innovative Approaches to Stormwater Management

WASHINGTON, DC — The U.S. Environmental Protection Agency is launching its third-annual Campus RainWorks Challenge, a prize contest that engages college students in developing innovative green infrastructure systems to reduce stormwater pollution and build resilience to climate change.

Through Campus RainWorks, teams of undergraduate and graduate students, working with a faculty advisor, develop a proposed green infrastructure project for the campus, showing how managing stormwater at its source can benefit the community and the environment. Since 2012, Campus RainWorks has engaged more than 300 student teams in developing green infrastructure solutions to urban stormwater management. Campus RainWorks encourages the use of green infrastructure projects on college and university campuses, trains the next generation of stormwater professionals, and develops new knowledge on the performance of green infrastructure.

Registration for the 2014 Challenge opens Sept. 2 and ends Oct. 3. Registrants must submit their entries by Dec. 19. Each winning team will earn a student prize of $1,000-$2,000 divided evenly among student team members and a faculty prize of $2,000-$3,000 to support green infrastructure research or training.

EPA will announce winning entries in April 2015.

Stormwater is one of the most widespread challenges to water quality in the nation. Large volumes of stormwater pollute our nation’s streams, rivers and lakes, posing a threat to human health and the environment and contributing to downstream flooding. Green infrastructure decreases pollution to local waterways by treating rain where it falls and keeping polluted stormwater from entering sewer systems. Green infrastructure reduces water pollution while increasing economic activity and neighborhood revitalization, job creation, energy savings, and open space. Green infrastructure builds resilience to the impacts of climate change, particularly by reducing the burden on local water infrastructure. Green infrastructure tools and techniques include green roofs, permeable materials, alternative designs for streets and buildings, trees, rain gardens and rain harvesting systems. Communities are increasingly using innovative green infrastructure to supplement or substitute for “gray” infrastructure such as pipes, filters, and ponds.

More information at www.epa.gov/campusrainworks.

Featured

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition