Process Cleaning for Healthy Schools (PC4HS) Provides Guidance on Handling Potential PCB-containing Dust

Sparks NV − The 501c3 Process Cleaning for Healthy Schools® (PC4HS) group is providing guidance on handling potential PCB-containing dust from substances such as older caulking in schools.

According to the US EPA: “Caulk containing potentially harmful polychlorinated biphenyls (PCBs) was used in many buildings, including schools, in the 1950s through the 1970s. Most schools and buildings built after 1979 do not contain PCBs in caulk. On September 25, 2009, EPA announced new guidance for school administrators and building managers with important information about managing PCBs in caulk and tools to help minimize possible exposure. Through EPA PCB Regional Coordinators, the Agency will also assist communities in identifying potential problems and, if necessary, developing plans for PCB testing and removal.”

PC4HS recommends that schools take two initial steps when caulk or other materials are suspected of containing PCBs:

1. Test first (a non-custodial role). Per EPA: “If testing reveals PCB levels above the levels EPA has determined to be safe, schools should attempt to identify any potential sources of PCBs that may be present in the building, including testing samples of caulk and looking for other potential PCB sources (e.g., old transformers, capacitors, or fluorescent light ballasts that might still be present at the school).

2. If elevated PCB content is found, proceed with EPA Guidance – See www.epa.gov/epawaste/hazard/tsd/pcbs/index.htm  and www.epa.gov/pcbsincaulk/

General PC4HS IAQ Guidance
Dust – potentially containing PCBs and other unwanted matter – should always be considered a “hazardous” substance, and be safely contained and removed from buildings rather than stirred into the air. PC4HS recommends high-efficiency containment and removal methods including:

  • Well-filtered vacuums certified for Indoor Air Quality (IAQ) by Carpet and Rug Institute (CRI) testing, and/or other independent labs.
  • Emptying and cleaning/inspecting vacuum filters regularly to avoid overloading and torn or compromised media; and to help ensure optimal safety and performance.
  • Emptying vacuum liners or bags outdoors and into a plastic trash liner to avoid spreading particles.
  • Damp cloth or microfiber dusters that capture and remove particulates. These materials should be laundered separately from other textiles.
  • Frequent dusting (e.g., in classrooms) utilizing cleaning specialists in a mapped and inspected process or plan that enables regular and thorough removal of soils (including dust).
  • Good ventilation to minimize airborne particles that may be harmful or allergenic.

The definition and identification of dust that is “potentially hazardous” has become broader as health science has advanced, since pollutants in even tiny amounts (parts per billion) are known to affect human hormonal systems; these are known as “endocrine disrupters.” Therefore, PC4HS follows the “precautionary principle” of avoidance and adheres to EPA information that advises a three-stage strategy to protect IAQ:

  1. Source removal or capture
  2. Ventilation
  3. Air cleaning (in partnership with HVAC departments)

The number one way, source removal or capture, is standard procedure for PC4HS crews. In addition, PC4HS is looking at ways to monitor and track airborne levels of dust (Reference: Dylos -- www.dylosproducts.com) and sample dust for allergens (Ref: Inbio -- www.inbio.com). See also www.pc4hf.com.

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.