Fixtures Provide Significant Savings

Plumbing fixtures

When it came time to replace plumbing fixtures at CCSD 15 in Palatine, Ill. Moen made the grade with ease.

Plumbing fixtures may not be the first thing on school districts’ minds when it comes to providing a world-class education, but they’re a critical element for keeping schools running smoothly. Just ask Craig Phillips. He oversees the operation and care of all of the facilities at the Community Consolidated School District (CCSD) 15 in Palatine, which is the third largest pre-K-8 school district in Illinois.

As manager of Environmental Services at CCSD 15, Phillips needs to ensure he’s working with the right partners when making decisions that affect the district. Among Phillips’ numerous responsibilities are purchasing and maintaining the district’s plumbing systems.

So when the time came to replace aged fixtures and equipment, he knew he needed to select plumbing products that would be durable, reliable and hold up for years to come.

The Research: Phillips investigated several brands, developing a rigorous set of standards to compare products.

“I was familiar with Moen from residential projects I had completed at my own firm, so I knew that the brand’s products are of the highest quality,” Phillips says. “Once I learned about the value of Moen Commercial’s offerings, including their lower lifetime cost, I knew they were the right choice.”

The Solution: Phillips chose Moen Commercial for the quality and durability of the flush valves, and its self-cleaning piston technology. “Unlike other products in the market, M•Power doesn’t have a rubber diaphragm or other components that will wear out and need to be replaced, which can save the district money over the life of the flush valve,” says Phillips.

Since the first installation, Phillips and the district have been pleased with the performance.

“I haven’t had any problems or complaints – Moen gets my vote every time. It’s highly superb compared to other products in the marketplace,” he says.

www.moencommerical.com

This article originally appeared in the issue of .

Featured

  • California School District Starts Construction on Public Safety Center

    The San Bernardino City Unified School District (SBCUSD) recently announced that construction has begun on a new public safety center that will house the district’s safety and security programs. According to a news release, the James Ramos Center for Public Safety will measure in at 17,140 square feet and contain the district’s Police Department, Office of Emergency Management, and cadet program.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition