Fixtures Provide Significant Savings

Plumbing fixtures

When it came time to replace plumbing fixtures at CCSD 15 in Palatine, Ill. Moen made the grade with ease.

Plumbing fixtures may not be the first thing on school districts’ minds when it comes to providing a world-class education, but they’re a critical element for keeping schools running smoothly. Just ask Craig Phillips. He oversees the operation and care of all of the facilities at the Community Consolidated School District (CCSD) 15 in Palatine, which is the third largest pre-K-8 school district in Illinois.

As manager of Environmental Services at CCSD 15, Phillips needs to ensure he’s working with the right partners when making decisions that affect the district. Among Phillips’ numerous responsibilities are purchasing and maintaining the district’s plumbing systems.

So when the time came to replace aged fixtures and equipment, he knew he needed to select plumbing products that would be durable, reliable and hold up for years to come.

The Research: Phillips investigated several brands, developing a rigorous set of standards to compare products.

“I was familiar with Moen from residential projects I had completed at my own firm, so I knew that the brand’s products are of the highest quality,” Phillips says. “Once I learned about the value of Moen Commercial’s offerings, including their lower lifetime cost, I knew they were the right choice.”

The Solution: Phillips chose Moen Commercial for the quality and durability of the flush valves, and its self-cleaning piston technology. “Unlike other products in the market, M•Power doesn’t have a rubber diaphragm or other components that will wear out and need to be replaced, which can save the district money over the life of the flush valve,” says Phillips.

Since the first installation, Phillips and the district have been pleased with the performance.

“I haven’t had any problems or complaints – Moen gets my vote every time. It’s highly superb compared to other products in the marketplace,” he says.

www.moencommerical.com

This article originally appeared in the issue of .

Featured

  • California District Breaks Ground on Major Campus Renovation

    Alameda Unified School District (AUSD) in Alameda, Calif., recently announced that construction has begun on a major campus overhaul for Otis Elementary School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates, Inc., for its design and construction, respectively.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Clearing the Air: H2M Busts Common AC/HVAC Myths

    When it comes to keeping school facilities comfortable and energy-efficient, there’s no shortage of heating, ventilation, and air conditioning (HVAC) advice circulating online or from well-intentioned neighbors. There are also many myths surrounding the negative impact AC/HVAC systems can have on school buildings.