Fixtures Provide Significant Savings

Plumbing fixtures

When it came time to replace plumbing fixtures at CCSD 15 in Palatine, Ill. Moen made the grade with ease.

Plumbing fixtures may not be the first thing on school districts’ minds when it comes to providing a world-class education, but they’re a critical element for keeping schools running smoothly. Just ask Craig Phillips. He oversees the operation and care of all of the facilities at the Community Consolidated School District (CCSD) 15 in Palatine, which is the third largest pre-K-8 school district in Illinois.

As manager of Environmental Services at CCSD 15, Phillips needs to ensure he’s working with the right partners when making decisions that affect the district. Among Phillips’ numerous responsibilities are purchasing and maintaining the district’s plumbing systems.

So when the time came to replace aged fixtures and equipment, he knew he needed to select plumbing products that would be durable, reliable and hold up for years to come.

The Research: Phillips investigated several brands, developing a rigorous set of standards to compare products.

“I was familiar with Moen from residential projects I had completed at my own firm, so I knew that the brand’s products are of the highest quality,” Phillips says. “Once I learned about the value of Moen Commercial’s offerings, including their lower lifetime cost, I knew they were the right choice.”

The Solution: Phillips chose Moen Commercial for the quality and durability of the flush valves, and its self-cleaning piston technology. “Unlike other products in the market, M•Power doesn’t have a rubber diaphragm or other components that will wear out and need to be replaced, which can save the district money over the life of the flush valve,” says Phillips.

Since the first installation, Phillips and the district have been pleased with the performance.

“I haven’t had any problems or complaints – Moen gets my vote every time. It’s highly superb compared to other products in the marketplace,” he says.

www.moencommerical.com

This article originally appeared in the issue of .

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition