Fixtures Provide Significant Savings

Plumbing fixtures

When it came time to replace plumbing fixtures at CCSD 15 in Palatine, Ill. Moen made the grade with ease.

Plumbing fixtures may not be the first thing on school districts’ minds when it comes to providing a world-class education, but they’re a critical element for keeping schools running smoothly. Just ask Craig Phillips. He oversees the operation and care of all of the facilities at the Community Consolidated School District (CCSD) 15 in Palatine, which is the third largest pre-K-8 school district in Illinois.

As manager of Environmental Services at CCSD 15, Phillips needs to ensure he’s working with the right partners when making decisions that affect the district. Among Phillips’ numerous responsibilities are purchasing and maintaining the district’s plumbing systems.

So when the time came to replace aged fixtures and equipment, he knew he needed to select plumbing products that would be durable, reliable and hold up for years to come.

The Research: Phillips investigated several brands, developing a rigorous set of standards to compare products.

“I was familiar with Moen from residential projects I had completed at my own firm, so I knew that the brand’s products are of the highest quality,” Phillips says. “Once I learned about the value of Moen Commercial’s offerings, including their lower lifetime cost, I knew they were the right choice.”

The Solution: Phillips chose Moen Commercial for the quality and durability of the flush valves, and its self-cleaning piston technology. “Unlike other products in the market, M•Power doesn’t have a rubber diaphragm or other components that will wear out and need to be replaced, which can save the district money over the life of the flush valve,” says Phillips.

Since the first installation, Phillips and the district have been pleased with the performance.

“I haven’t had any problems or complaints – Moen gets my vote every time. It’s highly superb compared to other products in the marketplace,” he says.

www.moencommerical.com

This article originally appeared in the issue of .

Featured

  • University of Washington Opens New Broadcast Studio

    The University of Washington in Seattle, Wash., recently announced the opening of Sundodger Studios, a new broadcast, production, and content facility, according to a news release. The university partnered with Anthony James Partners for the design and development of the studio, which will host about 100 live broadcasts and 120 live videoboard shows per year.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • University of Pennsylvania Releases Design of Future Physical Sciences Building

    The University of Pennsylvania (Penn) in Philadelphia, Penn., recently released renderings of an upcoming 350,000-square-foot Physical Sciences Building, according to news release. The facility was designed by CO Architects and will unite the university’s departments of Physics and Astronomy, Mathematics, and Earth and Environmental Science.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.