Denver School District Recycles Old Ceilings

Recycling Old Ceilings

Denver Public Schools found a way to promote sustainability and benefit their own construction projects with Armstong’s Recycling Program.

With the adoption of its Sustainability Management Plan, Denver Public Schools (DPS) is challenging students, teachers, staff, and parents to practice an “ethic of sustainability” to help reduce the impact its 185 schools have on the environment.

A major focus area of the plan calls for measurable improvements in landfill diversion rates and reduced greenhouse gas emissions from solid waste.

When renovations began on a 14-story office building DPS was converting to a vertical campus in downtown Denver, school officials met with the contractor to set sustainability goals for the project. “Recycling and repurposing of the materials that came out of the building was probably the number one item on that sustainability list,” explains DPS Construction Project Manager Katheryn Zeeb.

A large part of the construction waste consisted of old ceiling tiles that had been removed from the building during renovation. The contractor recommended that DPS recycle the old ceiling tiles through the Armstrong Ceiling Recycling Program.

The program enables building owners to ship discarded ceiling tiles from demolition and renovation projects to the nearest Armstrong plant as an alternative to landfill disposal. The discarded tiles are then used to manufacture new ceiling tiles.

Through its participation in the program, DPS eventually recycled over 131,000 square feet of used ceiling tiles, diverting nearly 67 tons of construction waste from landfills.

“The recycling program has proven to be advantageous from so many different levels – from savings on container costs and landfill fees to stewardship of resources for future generations,” says DPS Construction Services Director James Allen. “It’s been a good experience. Now that we’ve done it once, we’ll continue to do it. We’re a school district and we are life-long learners.”

www.armstrong.com

This article originally appeared in the issue of .

Featured

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.