Henry Sibley High School

Project Snapshot

PROJECT: Henry Sibley High School
LOCATION: Mendota Heights, Minn.
COMPANY NAME: Wenger Corporation
WEBSITE: www.wengercorp.com

THE CHALLENGE

Henry Sibley High School’s media storage room was a mix of old library shelves, second-hand cabinets and a used pegboard. Multiple users and events made organization difficult, as equipment was piled and stacked haphazardly.

Henry Sibley High School

Henry Sibley High School

Prior to the reorganization and addition of equipment cabinets, the media storage room was messy, disorganized and even a bit dangerous. Now, students and staff can find what they need when they need it.

THE SOLUTION

Wenger evaluated the size of the AV storage room and the equipment being stored before making recommendations. Then Wenger provided a variety of fixed and mobile media storage cabinets designed to accommodate every piece of AV equipment.

Three models of fixed cabinets were installed — standard, rackmount and organizer — with a variety of shelves, drawers and options. The organizer model features a wire grid inside the door and back panel designed to accommodate hooks, and other accessories: baskets, cable minders, mic stand holders and CD racks.

“Our new cabinet solution is night and day better than what we had before,” declares Dann Hurlbert, AV specialist & Film Studies instructor. “The cabinets are beautiful and really help keep the room looking clean.”

The room still contains the same equipment as before, but everything is organized in designated locations and out of sight. Space utilization also improved dramatically.

IMPACT ON LEARNING

Organizing and safeguarding all this valuable equipment helps ensure it will be available and operational when needed throughout the school. AV equipment represents a sizable investment, often acquired over multiple budget years. Hurlbert appraises HSHS’ inventory at more than $50,000, including two LCD projectors, four speakers, a mixer and “lots of little things that add up.”

He sees a growing proliferation of AV equipment today — equipment components are becoming smaller and more numerous. This makes organization more challenging, and more essential.

Editor's Review

We often do not realize that AV equipment can become unwieldy and take up many square feet of storage space. In the changing education environment, with the need for alternative learning spaces, etc., using available space in an efficient manner is always welcome. In this instance, the school administrators were able to better utilize the storage space, provide a more secure storage arrangement for expensive equipment and, as a bonus, by having it so much better organized, free up students’ and teachers’ time for longer instruction and rehearsals.

This article originally appeared in the issue of .

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Clearing the Air: H2M Busts Common AC/HVAC Myths

    When it comes to keeping school facilities comfortable and energy-efficient, there’s no shortage of heating, ventilation, and air conditioning (HVAC) advice circulating online or from well-intentioned neighbors. There are also many myths surrounding the negative impact AC/HVAC systems can have on school buildings.