PROJECT: The Medical Education-Telemedicine Building
INSTITUTION: University of California, San Diego
LOCATION: La Jolla, CA
COMPANY NAME: Armstrong Ceiling & Wall Systems
WEBSITE: www.armstrong.com/woodworks

THE CHALLENGE

The Medical Education-Telemedicine (MET) Building at the University of California, San Diego (UCSD) is a state-of-the-art training facility. As part of the MET’s design, the San-Francisco-based Skidmore Owings & Merrill design team was looking to create both a warm ambiance and a good acoustical environment in the facility’s signature space — its 7,500-square-foot, 360-seat lecture hall.

University of California, San Diego 

WoodWorks wall and ceiling panels from Armstrong add the warm look of wood to the UCSD lecture hall while providing the proper acoustic environment.

THE SOLUTION

Nearly 28,000 square feet of coordinated WoodWorks® Custom Ceilings and Custom Walls in a Cherry finish from Armstrong were installed. The majority of the panels are two-inch-by-five-inch in size, although 15 different sizes were part of the overall design.

All the panels incorporate a custom perforation for acoustical purposes. In areas where sound reflection is desired, the perforations only go halfway through the panel. Where sound absorption is required, the perforations go all the way through and are backed with a black acoustical fleece.

Project Architect Tim Waters explains that the design team and client selected wood ceilings and walls for the lecture hall to impart a feeling of warmth and intimacy. The ceiling is a sloped, stepped ceiling with five different elevations from front to back. The wall panels match the ceiling panels in size, finish and perforation pattern.

In terms of aesthetics, both the ceiling and wall panel joints are staggered to create a more interesting modular pattern. Even though the panels have staggered joints, proper spacing and layout was maintained to ensure that the rows of perforations and reveals stayed aligned, panel-to-panel.

A computer-learning center on the floor above the lecture hall contains the same WoodWorks wall panels as those in the lecture hall, including the perforations for acoustic control.

IMPACT ON LEARNING

Considering that the primary mode of teaching involves speech and listening, speech intelligibility is a prime concern in any size learning space, from classrooms to lecture halls. The key to designing a high-performing learning environment with good speech intelligibility is to take into account the acoustic performance of the ceiling and wall surfaces early in the planning and design stages.

Editor's Review

In a lecture hall, studies have shown that successful design allows the professor’s voice to be heard as clearly by students in the first row of seats as students in the last row. Absorptive material on the back and side walls will help reduce reverberation time and unwanted reflections, and parallel surfaces should be avoided, which can cause flutter echoes. The Armstrong materials selected for the design of UCSD’s MET Building will contribute to an acoustically ideal space for both students and instructors.

This article originally appeared in the issue of .

Featured

  • Longwood University Selects Builder for $73M Performing Arts Center

    Longwood University in Farmville, Va., recently announced that it has selected Swedish construction company Skanska as the builder of its new performing arts center, according to online news. The project involves the demolition of the current building and constructing a new, 64,500-square-foot facility.

  • Brightly Software, XOi Partner for New HVAC Data Solution

    Siemens company Brightly Software recently announced a partnership with data intelligence company XOi to integrate real-time HVAC system data into Brightly’s Asset Essentials CMMS, according to a news release. The integration will allow facilities more insight into HVAC system performance, health, and risk across their operations.

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.