Lesley University: Lunder Arts Center

Lunder Arts Center at Lesley University in Cambridge

PHOTOS © ROBERT BENSON PHOTOGRAPHY

The $46-million, 74,000-square-foot Lunder Arts Center at Lesley University in Cambridge, MA, is the heart of the school’s College of Art and Design and an anchor of Cambridge’s Porter Square arts district.

Challenged with creating a multifunctional complex that would facilitate experiential learning and student-faculty collaboration, engage the public and integrate a decommissioned historic church, Bruner/Cott & Associates focused on the creation of inspiring spaces, designing professional grade art studios, making a vibrant connection to the public realm and repurposing a historic New England church already on the site.

The historic church was relocated inward on the block to better relate to the scale of Massachusetts Avenue’s stores and residences. The move allowed the construction of a lower level across the site to reduce density. After restoring the church’s exterior to its c.1910 appearance its interior was reimagined, comprising an accessible two-level art library on the ground floor, several galleries, and a graphic design studio in the original wood attic rafters.

A new four-story studio structure on the church’s former site is clad in terracotta, complementing surrounding buildings. Its prolific glazing actively facilitates art making, housing teaching spaces for ceramics, drawing, painting, book making, printmaking, photography, animation and digital filmmaking.

A three-story Arts Commons connects the church structure to the studio building. It features a light-filled entry court that proffers circulation, event space and administrative offices. Its transparent entrance and gallery add vibrancy to the streetscape, welcoming the public to exhibits, lectures, conferences and symposia. The new complex anticipates LEED Gold certification.

“In addition to providing our students with state of the art studio facilities, the Center enables our university to establish itself as a more visible, prominent member of Cambridge/Boston art world,” says Dr. Stuart Steck, chair of the College of Art and Design’s Department of Art History and Critical Studies.

This article originally appeared in the issue of .

Featured

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

Digital Edition