Fort Rucker Elementary School

Department of Defense for Education Activity, Fort Rucker, Ala.

Fort Rucker Elementary SchoolThe new Fort Rucker Elementary School, located on an active military installation, is designed as a modern learning environment filled with features and technology to meet the needs of today’s 21st-century student. The academic spaces are housed in seven learning neighborhoods that include learning studios and staff collaboration areas that open to larger learning hubs. Located at each entry is a unique Learning Wall that gives each neighborhood its own identity and promotes “way-finding”. The learnings studios embrace 21st-century educational tools with writeable desks, flexible furniture and operable walls between studios that allow the educational environment to adapt to the needs of the changing curriculum. The Commons, a two-story social gathering space, serves as the transition between the learning neighborhoods and the dining/multipurpose space, gymnasium, music and art suites.

The elementary school building serves as a teaching tool incorporating elements that support sustainability and educational opportunities for the students. These features include: bio gardens, learning terrace, a history walk, a demonstration photovoltaic panel and wind turbine. Another hands-on learning feature is the energy dashboard with real-time data on the school’s energy usage.

Fort Rucker Elementary SchoolARCHITECT

SchenkelShultz Architecture
J. DAVID TORBERT, AIA
BROOK K. SHERRARD
AIA, LEED-AP
407.872.3322

PROJECT INFORMATION

CHIEF ADMINISTRATOR
Mikey Smiley

COMPLETION DATE
Estimated May 2018

GROSS AREA
133,542 sq. ft.

PER STUDENT
166 sq. ft.

SITE SIZE
13 acres

CURRENT ENROLLMENT
707 students

CAPACITY
800 students

COST PER STUDENT
$58,483

COST PER SQ. FT.
$350

TOTAL COST
$46,787,000

COMPANY PROFILE

SchenkelShultz has been a leader in the design of 21stcentury learning environments for the past 20 years. The firm’s experience totals over 50 million square feet of educational projects, including more than 5.3 million square feet of 21st-century schools.

This article originally appeared in the issue of .

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition