Daylighting Leads to a More Engaging Environment

Daylighting

Westside Christian High School gave students the benefits of natural light by installing Series M74 DS units for daytime lighting in the gymnasium.

Westside Christian High School is a non-denominational educational facility located in Tigard, Ore. After 33 years, the student population had outgrown the current space, prompting the construction of a new campus near downtown Portland.

Incorporating daylight into the school’s new interior gym became a main objective for administrators who wanted students to benefit from exposure to natural light during the school day while reducing the building’s electricity use.

The original strategy was to install traditional skylights, but concerns about adequate illumination and hot spots prompted the architect to seek other options.

InteriorTech, a building specialty contractor, proposed the use of Solatube Daylighting Systems, which, when compared to traditional skylights, provide a greater abundance and higher quality of light while reducing energy use.

Ultimately, InteriorTech installed 20 Solatube SkyVault Series M74 DS units for daytime lighting, complemented by LED lights with timers for nighttime lighting.

The advanced optics of the SkyVault Series captures massive amounts of high quality daylight for abundant output during athletic events, assemblies, and concerts.

With daylight illuminating the gym, electric lights stay off during the day allowing the school to cut its electricity consumption, lower its utility bills and minimize its carbon footprint.

Studies have shown that natural sunlight helps students feel more engaged, optimistic, and perform better overall. In addition to gymnasiums, daylighting can also be utilized in traditional classroom settings. Solatube’s SolaMaster Series is ideally suited to the classroom, providing clear, natural daylight to increase student engagement and responsiveness.

www.solatube.com

This article originally appeared in the issue of .

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

Digital Edition