Cooperative Agreement Leads to Savings

Arkansas State University (ASU) Convocation Center

Replacing 10,000+ seats was a big job for Arkansas State University, but with E&I, they were able to find both a durable and economical solution with ease.

Built in 1987, the Arkansas State University (ASU) Convocation Center is a colossal arena designed to accommodate concerts, rodeos, ice shows, trade shows and a variety of athletic events. The center serves a tri-state market area of 500,000, including more than 12,000 university students.

About three years ago, ASU determined it was time to replace the convocation center’s original seating, which consisted of 10,000+ seats on telescopic platforms. Project requirements called for a durable seating solution with the flexibility to accommodate the arena’s multi-purpose event configurations.

ASU focused on two factors when assessing potential seating suppliers: quality and cost. Irwin Seating Company was an immediate standout, due to its reputation as an industry leader in the telescopic seating space. As a member of E&I Cooperative Services, ASU could save significantly on its purchases with Irwin Seating, by utilizing the Cooperative’s competitively awarded contract.

“The E&I contract allowed us to use pricing that was already in place for this type of project, without having to go through a lengthy RFP process,” says Tim Dean, director of the convocation center. Irwin representatives worked closely with the university to develop a detailed plan, and the project was phased in over a three-year timeframe.

“Our arena functions 365 days a year, so the installation was bound to have its challenges,” Dean explains. “We experienced a few date overruns, but Irwin successfully completed the last phase in the summer of 2015, ahead of schedule. As for costs, we came in right on budget.”

ASU spent approximately $3.875 million, with an estimated savings of $100,000 through the E&I contract. According to Dean, “I would definitely recommend E&I’s Irwin Seating contract to other institutions. Whenever we can find ways to work together to maximize our time and cost savings, everyone is a winner.”

www.eandi.org

This article originally appeared in the issue of .

Featured

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.