Thermal Efficiency of the Building Envelope Is Critical

Would you like to save energy and go green? Then consider choosing exterior building materials with care. The importance of thermal efficiency cannot be overstated.

Studies have shown that improved energy-efficiency is the top driver behind sustainable design. The improvement of heating and cooling efficiency is the single most important attribute of the LEED standard, with efficiency thresholds being raised with each subsequent version of the standard. It is also the metric with the most obvious return on investment.

Although only a small portion of a structure’s surface area, exterior doors and frames are a functional part of the building envelope and can play an important role in overall energy efficiency. As with windows or walls, care should be taken to specify components that limit thermal exchange.

Improving the thermal performance of your building helps reduce energy usage and costs. You can help reduce heating and cooling loads by providing superior thermal performance windows and doors and framing systems.

Some steps for accomplishing this:

  • Properly sealed construction
  • Resistance to thermal extremes
  • Superior insulation
  • Thermally broken framing
  • Insulated panels in adjoining side lites
  • Insulated glass of at least 1-inch thickness
  • Keep vision lites to a minimum

Don’t be fooled by claims that equate the performance of the core material alone with the performance of a complete door assembly. Of any entrance system performance metric, thermal performance has the most easily represented, verifiable and measurable values. Without getting into technical details, remember — the U-Value of a product should be low, while the R-value should be high.

This article originally appeared in the issue of .

About the Author

Barbara Jo Serago is a sales manager, Strategic Initiative, for Special-Lite, Inc. (www.special-lite.com).

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.