Flooring Installation

Concrete slabs are the most common flooring base used in a range of buildings, including schools. Unfortunately, excessive moisture found in concrete slabs prior to a flooring installation can cause significant floor covering system failures such as debonding of coatings, microbial growth and flooring expansion.

There are, however, several steps that can be taken to mitigate and potentially prevent moisture issues before a floor covering is installed. These steps can be taken for either new or remodel projects.

The first step is to conduct moisture testing. Substrate surfaces must be tested for moisture emission prior to starting the installation. Most manufacturers and flooring installation contractors recommend Relative Humidity probe moisture testing.

If moisture emission is discovered, then proper precautions, such as the use of several topical applications prior to the flooring installation, can be used for moisture mitigation. Some of these topical applications include using reactive penetrants and moisture retarding coatings.

Finally, consider selecting a floor covering that has a higher tolerance for moisture and can perform in concrete slabs with elevated relative humidity levels. Some flooring options, such as a textile composite flooring, perform in areas with elevated moisture. The breathable nature of these flooring products allows moisture to pass through the backing rather than trap it underneath. This method of vapor transmission enables the flooring to be installed with no moisture mitigation as long as the Relative Humidity Test reads 95 percent or below.

Taking these steps prior to installation can save money and mitigate potential flooring system failures.

This article originally appeared in the issue of .

About the Author

David Daughtrey is the director of business development for education with J+J Flooring Group.

Featured

  • Rowan University, HPE Partner on New Learning Initiative

    Rowan University in Glassboro, N.J., recently announced that it has expanded its partnership with enterprise technology provider HPE to improve research capabilities and hands-on learning opportunities, according to a news release.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.