Drexel University: Dana and David Dornsife Center for Neighborhood Partnerships

Drexel University: Dana and David Dornsife Center for Neighborhood Partnerships

PHOTOS © BLT ARCHITECTS

The Dana and David Dornsife Center for Neighborhood Partnerships responds to Drexel University’s framework for civic engagement by providing new spaces that support the three dimensions of civic engagement. The current site of the Dornsife Center is home to three existing buildings — an 1867 Italianette mansion, an 1867 carriage works and a 1958 school building — that had sat dormant for a number of years.

The creation of the Center, with architectural and interior design services provided by BLT Architects of Philadelphia, involved the adaptive reuse of the three structures into a new university outpost providing community support services to the surrounding neighborhoods.

After the site and the primary donors for the renovation were identified, a stakeholder planning process was launched as a way to integrate the new Center into the priorities of the surrounding neighborhoods and the Drexel community. They used the Future Search planning framework; a consensus-building process that brings together participants from a range of perspectives who have some combination of authority, expertise and information relating to a particular issue. The workshops examine their past, present, and desired future to discover common ground and develop concrete action plans.

Initial facility programming and planning for the new uses involved careful analysis of each buildings limitations as well as opportunities to restore historic building fabric. Grouping common functions led to defining the buildings according to their best uses. The mansion, with its smaller rooms and more intact historic interiors, easily lent itself to office and conference room functions for the legal clinic and center administration.

The carriage house, which required significant gutting of later renovations, became the logical choice for the health, learning and gathering activities. STEM classrooms and spaces for design studios and technology and fabrication shops were located within the renovated classroom building.

This article originally appeared in the issue of .

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.