Problem (not) Solved

There is rarely time for us to get everything done that needs done, which also means there is never time to look back and see if we made progress. In my library is a copy of an old book, “Planning Schools for Tomorrow: The Issues Involved.” If I removed the reference to the year (which was 1942), you would think it was written yesterday. The issues they faced in 1942 were not so different than the issues we face today.

The same is true of their goals. “1.) A full program of education adapted to the capacities and interests of all the individuals whom the schools should serve. 2.) Carefully selected teachers, supervisors, administrators and specialists such as nurses, physicians, dentists, psychiatrists, librarians etc., who are competent, well-prepared and interested in the development of community life. 3.) Safe and sanitary school buildings, adapted to the education experiences and services to be offered, and adequate grounds and suitable equipment and instructional materials. 4.) An effective state and local organization, coordinated with other state and local educational and social agencies, which make possible the efficient offering of needed educational services. Advisory service from the federal government should be available. 5.) Adequate and joint support by the local, state and federal governments.”

When it came to facilities, the conversation was about accessibility; adequacy with respect to needed services; adequacy with respect to size; arrangement; utilization; possibility of rearrangement; and the possibility of expansion — conversations we are still having nearly 75 years later.

Adequate funding for education was, and still is, a concern. During the year that ended June 30, 1940, the U.S. spent approximately $2.7 billion for public elementary, secondary and higher education. The book says, “To offer the education program needed in this country would require a minimum expenditure of approximately $5 billion a year for regular current expenses. An additional $5 billion at least, is needed for the repair of old, and the construction of new, school buildings.”

The concern remains the same, but the dollars needed and being spent have increased. The projected current expenditures for elementary and secondary schools in 2015 is $576 billion; and according to the SP&M research on school construction, nearly $12.9 billion in construction was completed in 2015 (see page 17 for details). While increased funding may have improved some things, we still have a long way to go. Seventy-five years later and the issues remain the same!

This article originally appeared in the issue of .

Featured

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Pangram Secures Funding for AI Detection Technology

    Pangram, which provides technology that detects AI-generated text, recently announced that it has secured nearly $4 million in pre-seed and seed funding, according to a news release. The most recent round of investments, totaling $2.7 million, come on top of the pre-existing seed fund of $1.25 million.

  • Key Considerations for Office-to-Higher-Education Facility Conversions

    Since the onset of the COVID-19 pandemic, office-to-alternative-use conversions have become a recurring subject of urban development discourse. Office utilization rates across major U.S. cities remain below 50%, with vacancy rates exceeding 27% in San Francisco and 16% in New York. Higher education facilities present programmatic and spatial use cases that align readily with the typical characteristics of commercial office buildings.

  • Design Firm Populous Acquires Fentress Architects

    Design firm Populous, which specializes in sports and entertainment venues, recently announced its acquisition of Fentress Architects, based in Denver, Colo., according to a news release. Fentress’ primary focus is aviation projects and public buildings like museums, convention centers, and government facilities

Digital Edition