Making the move from library to media center

library to media center

Creating a space for collaboration and education was first priority when it was time to update the Sycamore High School Library. School Outfitters helped make this a reality with ease.

As Angela Webb, director of Sales at School Outfitters, walked the halls of Sycamore High School, the first thing she noticed was the library — and that there was no one in it. The large space was full of potential, but completely outdated. Shelves were lined with old periodicals now accessed online, furniture was not conducive to learning, and the room was dim and drab; students went to the library because they had to — not because they wanted to.

Doug Mader, Sycamore’s principal, expressed a clear vision to Webb: a “Starbucks vibe”, where students would come in, hang out and do work. Webb, who had worked with Mader on other projects, was eager to take on the challenge.

She met with the architects to talk about the colors, design and layout of the space. Together, the team discussed what the students would be using it for, and what types of furniture would be most effective. The space needed to foster community and collaboration; the furniture needed to be versatile, modern and comfortable. It needed to encourage group work. And, there needed to be plenty of spots to charge electronics.

To meet these demands, Webb chose mobile furniture that could be easily configured for various-sized groups, as well as comfortable pieces for reading or studying independently — many of which include built-in power. The team also incorporated a series of Learniture Shapes furniture — versatile seating that doubles as a work surface and fits together in a number of ways — as well as a “hive” centerpiece, where groups can gather for semi-enclosed conversations.

Well into its first year of use, the library now buzzes with activity. Full of students and teachers all day long, the library does just what everyone hoped it would: provide a space for collaboration, education and preparation for the future.

www.schooloutfitters.com

This article originally appeared in the issue of .

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition