Dedicated Outdoor Air Systems (DOAS)

An estimated 70 percent of all school buildings have indoor air quality (IAQ) problems, leading to an unhealthy environment. Many common IAQ problems are associated with improperly operated and maintained HVAC systems, overcrowding, moisture incursion and dampness, and presence of outside air pollutants. IAQ problems have a greater impact on children than adults, as children breathe a greater volume of air relative to their body weight.

Additionally, occupants of school buildings are close together, with approximately four times the occupant density in schools compared to office buildings. Mounting evidence indicates that the quality of a school’s physical environment affects educational achievement and more attention is now being paid to addressing IAQ issues.

With this in mind, the installation of a DOAS system can dramatically improve indoor air quality, creating a happier, healthier and more productive environment for students, teachers and staff, and some systems assist in earning valuable LEED points. DOAS systems condition up to 100 percent of outdoor air — improving air quality, and reducing the load on other HVAC equipment in a building. This reduction in HVAC equipment load can result in significant savings in energy consumption over the lifetime of a system.

Humidity control is another great benefit of these systems. Human occupants and certain equipment in a school will generate moisture, but most moisture comes from the ambient conditions. If an uncontrolled amount of moisture is continually added to a building, a mold-friendly environment will result. Even if mold is not a concern, the moisture content in the air will affect the comfort level for occupants. These and other benefits make DOAS systems the perfect choice for school buildings.

This article originally appeared in the issue of .

About the Author

Kevin Miskewicz is the director of Commercial Marketing with Mitsubishi Electric Cooling & Heating. He can be reached at [email protected] or 888/979-9686.

Featured

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • Johns Hopkins Starts Construction on New Residence Hall, Dining Facility

    The Homewood Campus of Johns Hopkins University in Baltimore, Md., recently began construction on a new residence hall and dining facility, according to university news. The work involves demolishing the existing Alumni Memorial Residence Hall I, which was built in 1923, to make room for the new facility.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.