Dedicated Outdoor Air Systems (DOAS)

An estimated 70 percent of all school buildings have indoor air quality (IAQ) problems, leading to an unhealthy environment. Many common IAQ problems are associated with improperly operated and maintained HVAC systems, overcrowding, moisture incursion and dampness, and presence of outside air pollutants. IAQ problems have a greater impact on children than adults, as children breathe a greater volume of air relative to their body weight.

Additionally, occupants of school buildings are close together, with approximately four times the occupant density in schools compared to office buildings. Mounting evidence indicates that the quality of a school’s physical environment affects educational achievement and more attention is now being paid to addressing IAQ issues.

With this in mind, the installation of a DOAS system can dramatically improve indoor air quality, creating a happier, healthier and more productive environment for students, teachers and staff, and some systems assist in earning valuable LEED points. DOAS systems condition up to 100 percent of outdoor air — improving air quality, and reducing the load on other HVAC equipment in a building. This reduction in HVAC equipment load can result in significant savings in energy consumption over the lifetime of a system.

Humidity control is another great benefit of these systems. Human occupants and certain equipment in a school will generate moisture, but most moisture comes from the ambient conditions. If an uncontrolled amount of moisture is continually added to a building, a mold-friendly environment will result. Even if mold is not a concern, the moisture content in the air will affect the comfort level for occupants. These and other benefits make DOAS systems the perfect choice for school buildings.

This article originally appeared in the issue of .

About the Author

Kevin Miskewicz is the director of Commercial Marketing with Mitsubishi Electric Cooling & Heating. He can be reached at [email protected] or 888/979-9686.

Featured

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Florida SouthWestern State College, Skanska Partner for Humanities Hall Renovation

    Florida SouthWestern State College (FSW) in Fort Myers, Fla., recently announced that it is partnering with construction firm Skanska to renovate the school’s Humanities Hall, according to a news release.

Digital Edition