Defense Starts At the Entrance

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Quick fixes using carpet tiles are often preferred, but are they always the best, cost-efficient approach? Your entrance is where the first line of defense should start for trapping dirt and water. Too often, less expensive alternatives like carpet tiles only add to the problem.

The flooring product industry has changed significantly and it will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slip, trips and falls while providing exceptional defense for managing dirt and water entering your building. When dirt and water are introduced to carpet tiles, significant wear begins to occur, usually requiring frequent replacement and becoming costly after time. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another and are also available for surface mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.