Controlling Noise in Classrooms

Acoustical performance is a vital ceiling selection criterion for classrooms. The reason: students must be able to hear and understand their instructor if they are to learn.

In the past, acoustical ceilings offered either good sound absorption to decrease unwanted sound levels, or good ceiling attenuation to block unwanted sound intrusion from adjacent classrooms or corridors, but not both absorption and blocking in the same ceiling.

Now, the science behind the ceiling is able to offer a new generation of acoustical ceiling panels that provide an ideal combination of sound absorption as denoted by their Noise Reduction Coefficient (NRC) and sound blocking as denoted by their Ceiling Attenuation Class (CAC) in the same panel.

The NRC indicates the ability of a ceiling to absorb sound. It is expressed as a number between 0.00 and 1.00, and indicates the percentage of sound it absorbs. An NRC of 0.60 means a ceiling absorbs 60 percent of the sound that strikes it. A ceiling with an NRC less than 0.60 is considered low performance, one with an NRC of 0.70 or greater, high performance.

The CAC indicates the ability of a ceiling to block sound in one space from passing up into the plenum and transmitting back down into an adjacent space that shares the same plenum. The higher the number, the better the ceiling acts as a sound barrier. A ceiling with a CAC less than 25 is considered low performance, one with a CAC of 35 or greater, high performance.

Regardless of whether it’s new construction or renovation, the best solution for both reducing the level of sound in a classroom and limiting sound intrusion into it is an acoustical ceiling panel that combines an NRC of 0.70 or greater and a CAC of 35 or greater.

This article originally appeared in the issue of .

About the Author

Sean Browne is principal scientist - Global Acoustics for Armstrong Ceilings.

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

Digital Edition