Controlling Noise in Classrooms

Acoustical performance is a vital ceiling selection criterion for classrooms. The reason: students must be able to hear and understand their instructor if they are to learn.

In the past, acoustical ceilings offered either good sound absorption to decrease unwanted sound levels, or good ceiling attenuation to block unwanted sound intrusion from adjacent classrooms or corridors, but not both absorption and blocking in the same ceiling.

Now, the science behind the ceiling is able to offer a new generation of acoustical ceiling panels that provide an ideal combination of sound absorption as denoted by their Noise Reduction Coefficient (NRC) and sound blocking as denoted by their Ceiling Attenuation Class (CAC) in the same panel.

The NRC indicates the ability of a ceiling to absorb sound. It is expressed as a number between 0.00 and 1.00, and indicates the percentage of sound it absorbs. An NRC of 0.60 means a ceiling absorbs 60 percent of the sound that strikes it. A ceiling with an NRC less than 0.60 is considered low performance, one with an NRC of 0.70 or greater, high performance.

The CAC indicates the ability of a ceiling to block sound in one space from passing up into the plenum and transmitting back down into an adjacent space that shares the same plenum. The higher the number, the better the ceiling acts as a sound barrier. A ceiling with a CAC less than 25 is considered low performance, one with a CAC of 35 or greater, high performance.

Regardless of whether it’s new construction or renovation, the best solution for both reducing the level of sound in a classroom and limiting sound intrusion into it is an acoustical ceiling panel that combines an NRC of 0.70 or greater and a CAC of 35 or greater.

This article originally appeared in the issue of .

About the Author

Sean Browne is principal scientist - Global Acoustics for Armstrong Ceilings.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.