Controlling Noise in Classrooms

Acoustical performance is a vital ceiling selection criterion for classrooms. The reason: students must be able to hear and understand their instructor if they are to learn.

In the past, acoustical ceilings offered either good sound absorption to decrease unwanted sound levels, or good ceiling attenuation to block unwanted sound intrusion from adjacent classrooms or corridors, but not both absorption and blocking in the same ceiling.

Now, the science behind the ceiling is able to offer a new generation of acoustical ceiling panels that provide an ideal combination of sound absorption as denoted by their Noise Reduction Coefficient (NRC) and sound blocking as denoted by their Ceiling Attenuation Class (CAC) in the same panel.

The NRC indicates the ability of a ceiling to absorb sound. It is expressed as a number between 0.00 and 1.00, and indicates the percentage of sound it absorbs. An NRC of 0.60 means a ceiling absorbs 60 percent of the sound that strikes it. A ceiling with an NRC less than 0.60 is considered low performance, one with an NRC of 0.70 or greater, high performance.

The CAC indicates the ability of a ceiling to block sound in one space from passing up into the plenum and transmitting back down into an adjacent space that shares the same plenum. The higher the number, the better the ceiling acts as a sound barrier. A ceiling with a CAC less than 25 is considered low performance, one with a CAC of 35 or greater, high performance.

Regardless of whether it’s new construction or renovation, the best solution for both reducing the level of sound in a classroom and limiting sound intrusion into it is an acoustical ceiling panel that combines an NRC of 0.70 or greater and a CAC of 35 or greater.

This article originally appeared in the issue of .

About the Author

Sean Browne is principal scientist - Global Acoustics for Armstrong Ceilings.

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Fellowes Launches New Textile Collection

    Fellowes Contract Interiors recently partnered with Momentum Textiles & Wallcoverings to launch a new line of high-end-design, cost-effective textiles, according to a news release. Part of Momentum Textiles’ Kickstart collection, the new selection offers high-quality and versatile textiles for both smaller budgets and the early design phase of larger projects.

  • Carnegie Grants R2 Status to East Texas A&M

    East Texas A&M University in Commerce, Texas, recently announced that it has been designated a Research 2 (R2) institution by the Carnegie Classification of Institutions of Higher Education, according to a news release. The R2 designation took effect on February 13.