Controlling Noise in Classrooms

Acoustical performance is a vital ceiling selection criterion for classrooms. The reason: students must be able to hear and understand their instructor if they are to learn.

In the past, acoustical ceilings offered either good sound absorption to decrease unwanted sound levels, or good ceiling attenuation to block unwanted sound intrusion from adjacent classrooms or corridors, but not both absorption and blocking in the same ceiling.

Now, the science behind the ceiling is able to offer a new generation of acoustical ceiling panels that provide an ideal combination of sound absorption as denoted by their Noise Reduction Coefficient (NRC) and sound blocking as denoted by their Ceiling Attenuation Class (CAC) in the same panel.

The NRC indicates the ability of a ceiling to absorb sound. It is expressed as a number between 0.00 and 1.00, and indicates the percentage of sound it absorbs. An NRC of 0.60 means a ceiling absorbs 60 percent of the sound that strikes it. A ceiling with an NRC less than 0.60 is considered low performance, one with an NRC of 0.70 or greater, high performance.

The CAC indicates the ability of a ceiling to block sound in one space from passing up into the plenum and transmitting back down into an adjacent space that shares the same plenum. The higher the number, the better the ceiling acts as a sound barrier. A ceiling with a CAC less than 25 is considered low performance, one with a CAC of 35 or greater, high performance.

Regardless of whether it’s new construction or renovation, the best solution for both reducing the level of sound in a classroom and limiting sound intrusion into it is an acoustical ceiling panel that combines an NRC of 0.70 or greater and a CAC of 35 or greater.

This article originally appeared in the issue of .

About the Author

Sean Browne is principal scientist - Global Acoustics for Armstrong Ceilings.

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • KI Launches K–12 Classroom Furniture Giveaway

    Contract furniture company KI recently announced the launch of its fourth-annual Classroom Furniture Giveaway, which awards $50,000 each to four K–12 educators across the U.S., according to a news release. The goal is to address decreasing student engagement and increasing teacher burnout numbers by updating learning spaces to accommodate modern needs.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

Digital Edition