University of Nebraska at Kearney: Wellness Center

University of Nebraska at Kearney: Wellness Center

PHOTOS © KESSLER PHOTOGRAPHY

The new Wellness Center at the University of Nebraska at Kearney rebrands wellness on campus, creating an inviting hub for student fitness and expanding the university’s leading-edge kinesiology research. Inspired by the school’s mission statement of “We are Difference Makers,” the LEO A DALY design team sought to promote self-discovery, sportsmanship, learning and an appreciation for personal wellness through architecture and interior design.

The two-story, $6.5 million addition moves the university’s workout facilities and human performance lab from landlocked isolation in the middle of the gym to a prominent place on the campus mall. The exterior “frame” concept functions as both advertisement and subtle metaphor, positioning wellness as a public, social activity. At night, the curved curtain wall glows as a beacon for campus wellness.

The sun-filled first floor encourages a lifestyle of fitness, favoring noncompetitive, group activities and providing space for socialization. Cardio takes center stage, separated from strength-training equipment. Three group-training rooms enable a robust schedule of yoga, Zumba and other workout classes. A 30-foot climbing wall offers an exciting challenge, and touchdown spaces, flexible block furniture and a juice bar enhance the social atmosphere.

“It’s laid out as a gathering place,” says Martin Lane, AIA, project manager with LEO A DALY. “It’s not just a place you work out; it’s a place you want to meet up with a friend.”

The second floor houses the Human Activity and Wellness Lab, a fast-growing, nationally recognized health science program distinctive for its community-centered outreach and wellness intervention. Dedicated workout equipment, a demonstration kitchen and specialized exam rooms allow the Kinesiology and Sport Sciences department to work with community members in groups, offer cooking and wellness classes and conduct obesity research.

This article originally appeared in the issue of .

Featured

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.