Lighting Upgrade Leads to Big Savings

Cree lighting in school parking lot

Toledo Public Schools realized a large energy savings by switching to Cree lighting, which also led to a large financial savings.

The Toledo Public School’s (TPS) Maintenance and Operations Department supports 42 schools. As the director of Maintenance and Operations, Quintin Reynolds is responsible for finding new ways to save energy. Reynolds along with key staff member, Ron Miller, and TPS’s energy consultant, Palmer Conservation Consulting, worked to save energy by replacing 2,553 outdoor metal halide and high-pressure sodium lights with Cree LED luminaires.

The Maintenance and Operations Department with Palmer Conservation Consulting chose Cree LED lights because of the product longevity, low maintenance and the 10-year limited warranty.

“Cree had a 10-year warranty when everyone else offered seven years or less,” says Miller. “The lighting quality is there and the fixtures are good quality — well built.”

“TPS likes the performance, price point, and how it looks compared to other lights on the market,” adds Ron Miller. “In addition, the lighting enhanced the look of the schools. The luminaires come in many colors so we could choose colors to complement the architecture of each school.”

The crisp, white light of Cree’s luminaries can create a safe atmosphere for students, administrators and visitors. As important, the Cree luminaires are backed by Cree’s 10-year industry-leading limited warranty, providing investment protection. By upgrading the outdoor lighting at all 42 schools with Cree LED luminaires, TPS reduced energy consumption by 2.8 million kWh .

Looking at Start High School, Cree is estimating that they will see a 69-percent energy savings based on watt reduction. Since Cree LED lights are virtually maintenance-free for 10 years, TPS expects a lifetime savings of $125,072 on maintenance costs by not having to send staff and trucks out to replace bulbs. Energy and maintenance combined, the savings equates to a 1.8-year payback period.

www.cree.com/lighting

This article originally appeared in the issue of .

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition