Entrance Flooring Systems

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Your entrance is where the first line of defense should start for trapping dirt and water.

The flooring product industry has changed significantly and will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slips, trips and falls while providing exceptional defense for managing dirt and water entering your building. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another. These systems are also available for surface-mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Texas A&M Breaks Ground on Campus Visitor Center

    Texas A&M University in College Station, Texas, recently held a groundbreaking ceremony for a new campus learning hub and visitor center, according to a news release. The 211,000-square-foot Aplin Center will stand three stories and is scheduled to open to students in 2028.

  • California Boarding School Opens New Inquiry Collaborative Facility

    Cate School, a boarding school in Carpinteria, Calif., for students grades 9–12, recently announced that it has finished renovating a historic dining hall into a new academic hub, according to a news release. The school partnered with Blackbird Architects and Tangram Interiors on the two-story, 16,000-square-foot Inquiry Collaborative.

  • Photo courtesy of Spiezle Architectural Group, Inc.

    West Melbourne School for Science Completes Expansion Project

    The West Melbourne School for Science, which serves students grades PreK–6 in West Melbourne, Fla., recently completed a 12,450-square-foot elementary school expansion, according to a news release.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.