John Adams Elementary: District 11 Students Move to Reopened School

Colorado Springs – The first day of school for students at John Adams Elementary, on August 18, will mark a new beginning for students and staff. District 11 selected RTA Architects and Nunn Construction to completely renovate the school, which had not been in use by the district for about five years.

John Adams EL

RTA Architects

The colorful mural in the library at John Adams Elementary was hand-painted by RTA’s interior designer Greg Johnson.

The District 11 school board voted last February to close nearby Helen Hunt Elementary because that building is in need of an estimated $14 million in repairs. The Lane Foundation plans to covert the Helen Hunt Elementary building into a community center, and RTA has been retained as the architect-of-record. The 400 students from Helen Hunt who will now attend John Adams Elementary are in for a treat.

RTA's Principal-in-Charge, Brian Calhoun, said it has been exciting to see the transformation at the school over the last three months. The design for the renovation focused on improved student safety and enriched learning environments. The school's exterior will feature a welcoming layered entry canopy, an improved protected drop-off, outdoor seating areas, expanded parking, a new roof, new playgrounds and shade structures, and a synthetic turf play area.

The interior features new finishes that bring welcoming warmth of color and pattern. All classrooms received new lighting, and a new controlled entry vestibule will enhance safety. A full-service kitchen will offer the opportunity for "from-scratch" cooking. A new mechanical system will provide air conditioning, while new windows will improve thermal performance of the building. New security systems, fire alarm and technology upgrades are also in place.

Among the new technology assets at John Adams are flat panel interactive boards in classrooms combined with traditional white boards to give teachers and students more options at their disposal. Classrooms will feature advanced ergonomic furniture that will allow children more freedom of movement. This year, every 3rd, 4th, and 5th grader will also be given their own tablet computer for use during the school year. Kindergarten through 2nd graders will have access to six iPad Minis in each classroom.

The library will welcome students with a large entryway that can be closed with a glass overhead door when a quiet environment is needed. The ceilings were removed in a portion of the space to create an expansive feel that now incorporates daylight and views to the outside. The space will utilize flexible furniture systems that allow the room to be quickly and easily reconfigured. A computer lab is connected to the library with a large glass overhead door that can open and expand the size of the library.

Calhoun commented, "RTA and the entire design team is excited for the students and staff of John Adams. The district worked extremely hard with us to provide a superior design for a safe and productive educational experience."

Since 1975, RTA Architects has created award-winning architectural and interior designs for the Colorado built environment. RTA specializes in education, healthcare, retail and commercial properties. For more information, visit www.rtaarchitects.com.

Featured

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • New eBook Shares Guidelines on Building CTE Centers

    Career and Technical Education (CTE) curriculum and resources provider iCEV recently announced the publication of a new eBook sharing guidance and insights on building new CTE facilities, according to a news release.

Digital Edition