At The End of The Day

Vacuum cleaners and other floor machines that are well maintained and kept clean and serviced still need to be properly stored when not in use. Improper or careless storage of the best-kept cleaning tools can impact their effectiveness and useful life, and therefore your bottom line.

Be sure any equipment with a motor is shut down properly, per manufacturer’s specifications. This information is in the owner’s manual… which you should be sure to read and retain. Some machines may need idling time before being shut down completely. Whatever procedures are manufacturer-recommended for shutting down a piece of equipment should be followed.

Properly secure and store any cords, hoses, nozzles or other components for each machine as indicated by the manufacturer. Don’t toss these items on a shelf or in a box where they may be separated from the unit to which they belong. This is especially important if more than one person uses each unit, as the next person to use the unit may not be able to locate the pieces needed to properly operate the equipment.

Don’t shove your vacuums or floor machines into crowded closets or other cramped spaces. This can lead to other items being stacked against or on them, which can lead to damage — including dents and scratches, and worse — to the equipment. Tools that look neglected are more likely to be misused and neglected by the people who use them.

If you have outdoor storage units that are not heated, do not store power-operated machines in these spaces, especially in the winter. Machine components wear down more rapidly when started or operated in extreme cold conditions.

This article originally appeared in the issue of .

Featured

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Clemson to Launch North America’s Largest College Campus Smart Parking Program

    Clemson University in Clemson, S.C., recently announced a partnership with smart parking and curbside management solutions provider eleven-x to launch a smart parking initiative for its population of 29,000 students and faculty, according to a news release.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition