Why do we need a fire sprinkler shut-off tool?

The best way to protect a building and its occupants from fire is to have an automatic fire sprinkler system. However, when a fire sprinkler system accidentally activates it can cause hundreds of thousands of dollars in damage. Talk to anyone who has had a fire sprinkler accident and you will hear just how catastrophic water damage can be. I have seen sprinkler accidents caused by everything from a kickball game in a dorm hallway to moving furniture in a science lab to hanging a clothes hanger on a sprinkler head in a classroom. When these accidents occur, a fire sprinkler shut-off tool can immediately stop the flow of water to the activated head while keeping the rest of the sprinkler system functional.

A single fire sprinkler head can expel between 30 to 100 gallons per minute, causing an estimated $1,000 of damage per minute. As a firefighter, I have personally seen over 30 stories of a building destroyed from a single sprinkler head. In most cities, a building’s water supply can only be shut off by the fire department. Waiting for firefighters to be dispatched, respond, locate, access and shut down the system can result in hundreds of gallons of unclean water pouring into your hallways and classrooms. Stopping the activated head quickly using a sprinkler tool helps avoid expensive damages and keeps every sprinkler head in the building pressurized. Your buildings stay open and operational while your students and faculty remain safe and protected.

Whether you are looking to protect dorm rooms, lab equipment or classrooms, you cannot afford to have a sprinkler accident without keeping a fire sprinkler shut-off tool on site.

This article originally appeared in the issue of .

About the Author

Matt Scarpuzzi is a San Diego firefighter and owner of Quickstop Fire Sprinkler Tools (www.quickstoptool.com). Contact him at [email protected] or 858/750-2232.

Featured

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.