NSF 342 Included in LEED v4 Pilot Credit

Washington, D.C. — The U.S. Green Building Council (USGBC) has cited wallcoverings certified to the NSF/ANSI 342 Sustainability Standard for Wallcovering as eligible for credits under LEED® v4. Certified products qualify for a possible one point under the Pilot Credit entitled Certified Multi-attribute Products and Materials. The intent of the Pilot Credit is “to encourage the use of products and materials for which life-cycle information is available and that have environmentally, economically, and socially preferable life-cycle impacts,” according to USGBC.

Wallcoverings covered by NSF/ANSI 342 include textiles, vinyl, vinyl coated, alternative polymer, alternative polymer coated, paper and natural fiber products. The standard evaluates criteria across the product life cycle, from raw material extraction through manufacturing, distribution, use, and end-of-life management. Unique to this standard is the requirement that both manufacturer and distributor qualify in order for the product to carry the certification.

“We are pleased that USGBC has expanded LEED to include NSF/ANSI 342 as an accepted certification program,” said Sean Samet, Executive Director for the Wallcoverings Association. “The wallcoverings industry is continually working to reduce the environmental impact of its products, and is proud of the industry-wide effort that developed this multi-attribute standard. The third-party certification provides accountability and transparency to all aspects of the product’s manufacture and distribution.”

For more information, contact the WA at (312) 321-5166 or visit wallcoverings.org.

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition