Crandall ISD High School Begins Expansion Project

Crandall ISD High SchoolAs a part of a 2017 bond program, Crandall (Texas) ISD has teamed with WRA Architects to design two new additions and renovations to the existing high school. This expansion will include a 3,000-square-foot cafeteria and 43,000-square-foot classroom addition increasing the capacity by 450 students.

The addition will provide much needed classroom space to house the growing population. It will boast Next Generation Learning environments that promote collaboration between students as well as teachers. Large overhead doors will help create transparency between surrounding classrooms and the multipurpose space, thus helping to encourage the free exchange of ideas through group learning. Movable seating and furniture will be provided with plenty of outlets for charging the technology used by students at Crandall ISD. Seventeen new classrooms will be outfitted with movable desks encouraging collaborative learning.

Four new physics and biology science labs with shared prep rooms will have built in perimeter casework with mobile tables making the space flexible for different teaching strategies. Curriculum will be taught in new culinary, interior design and medical areas. To simulate real world medical practice, classrooms will have flexible learning spaces with patient beds and phlebotomy stations.

The exterior masonry on the classroom addition will respect the original design by following the same details and patterns. At the cafeteria addition, a more contemporary design was chosen with full height glass curtain wall and a deep overhanging roof structure, supported by elegant round columns. Similar masonry details will be used along with blue window mullions to tie the addition into the existing building.

An outdoor plaza area will be located to the west of the addition to provide a space for people to congregate before and after events held in the newly expanded cafeteria. This space should become an extension of the cafeteria due to the transparency between the interior and exterior environments. Inside the space, 175 additional occupants will be able to dine through a mix of table seating and stand-up bar space. A fourth serving line will provide to address additional serving needs.

The additions will promote next generation learning and will increase their dining and performing arts capabilities. Crandall ISD’s newly expanded High School campus will be an attractive and functional addition to the school district and community.

To learn more, visit WRA Architects at www.wraarchitects.com.

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • University of Kansas Breaks Ground on Entrepreneurship Hub

    The University of Kansas in Lawrence, Kan., recently held a groundbreaking ceremony for the new KU Entrepreneurship Hub, according to university news. The Hub is part of the university’s School of Business and will include spaces for experiential learning and programming.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.