Renovated Hill College House Reopens as University of Pennsylvania Student Residence

Hill College HouseDesigned by renowned Finnish American architect Eero Saarinen and built in 1960, Hill College House at the University of Pennsylvania has undergone a 15-month, $80 million, LEED Gold-targeted renovation. The internationally recognized landmark will reopen to 500 student residents later this month.

The five-story, 195,000-square-foot brick residence has undergone a comprehensive renovation, preserving Saarinen’s revolutionary design vision for communal living with multiple public spaces at varying physical and social scales. Originally a women’s dormitory, Hill College House features an allegorical entry bridge over a landscaped “moat” and surrounding spiked metal fence. Student lounges and seminar rooms are built around a vast central atrium that overlooks a dining area on the lower level.

“In this complex and challenging renovation, Mills + Schnoering Architects has designed multiple deft interventions that accumulate into a complete refresh of this important building — one that respects and invigorates Saarinen’s design and the community life it so richly fosters,” says University Architect David Hollenberg.

Mills + Schnoering Architects of Princeton, NJ, led the design and construction team. Specialists in historic renovation, the firm previously worked on Saarinen’s Gateway Arch in Saint Louis.

“Our approach respects the original Saarinen Hill College House design, preserving its legacy,” says Mills + Schnoering Partner-in-Charge, Michael Mills, FAIA. “Our choices were inspired both by the integrity of the architecture and by the contemporary student experience, with a design meant to balance the two in a welcoming, accessible student residence.”

Features of the renovation design include:

  • Expansion of dining facilities by 50 percent, including major kitchen upgrades.
  • Restoration of the iconic “drawbridge” entrance and landscaped “moat.”
  • Removal, restoration, and refitting of over 400 windows.
  • New furniture and finishes designed to echo the building’s midcentury style and reinterpret
  • Saarinen’s bold color palette and furnishings.
  • All new MEP systems and the introduction of air-conditioning.
  • Conversion of all bathrooms to individual restrooms and shower rooms.
  • Installation of LED lighting in the center atrium.
  • New elevator and lift to provide accessibility compliance.
  • Perimeter wall insulation, a new roof, and restoration of two outdoor courtyards.

Project goals included strengthening the sense of community at the heart of Hill College House’s original design and respecting the historic significance of the building’s materials and details, by maintaining as much fabric and design intent as possible while inserting modern systems and amenities.

Featured

  • Indiana University Launches Capital Campus in D.C.

    Indiana University recently held a ribbon-cutting ceremony for the new IU Capital Campus in Washington, D.C., according to university news. The eight-story facility will provide a central hub for the university’s existing programs and business operations based in D.C., uniting them under one roof and providing the opportunity to expand.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • Rowan University, HPE Partner on New Learning Initiative

    Rowan University in Glassboro, N.J., recently announced that it has expanded its partnership with enterprise technology provider HPE to improve research capabilities and hands-on learning opportunities, according to a news release.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.