Scientifically Advanced Research Complex Completed at Arizona State

Studio Ma has unveiled their innovative, scientifically advanced building concept created for Arizona State University’s planned ISTB-7 — an interdisciplinary science and research complex with a vast atrium biome full of plants and water.

ASU Science Center

Bringing together regenerative and bioclimactic technologies, ISTB-7 is conceived as a highly sustainable science and technology center for the ASU Tempe campus. The transit-oriented solution includes a light rail station, and the structure’s climate-responsive, regenerative technologies transform it into a source of energy, water, carbon and other nutrients.

The Studio Ma design for the Interdisciplinary Science & Technology Building, or ISTB-7, ensures it will produce enough carbon, energy, water and waste to achieve triple net-zero performance. To do so, ISTB-7 building materials absorb carbon and convert it to life-giving nutrients for durable materials and enriched soil. Its atrium biome purifies waste air, and a wetlands landscape recycles water using natural, bio-based methods. Rainwater is collected, and sun shades keep the interiors cool and comfortable.

Materials incorporate ASU’s own cutting-edge scientific research on integrated carbon-capture technology. Methods to save and produce energy include air currents, evapotranspiration and photovoltaics. The complex treats and recycles sewage for use as greywater using low-energy, bio-based systems. With its rail transit connection, the complex creates a new campus gateway.

Featured

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

Digital Edition