University of Portland Breaks Ground on New Academic Building

Groundbreaking on the University of Portland’s new academic building, Dundon-Berchtold Hall, took place in September. Board of Regents member Amy Dundon-Berchtold and Jim Berchtold ’63, were joined in turning the ceremonial first shovel by University President Rev. Mark L. Poorman, C.S.C.; Provost Thomas Greene; University Board of Regents Chair Thomas Arndorfer; and ASUP President Brandon Rivera.

University of Portland

The Dundon-Berchtolds made the $15 million lead gift commitment for construction of the hall on the university's Portland, OR, campus. This gift also funded the Dundon-Berchtold Institute for Moral Formation and Applied Ethics, which will be housed in the new building. Along with providing a home for the Institute, the new academic center will also add over 63,000 square feet of classrooms, offices and the recently announced Brian Doyle Lecture Hall.

In his remarks, Fr. Poorman called the groundbreaking a “hope-filled occasion.” He went on to say, “Dundon-Berchtold Hall is a critical step in the university’s commitment to providing the best possible education for our students. One that’s holistic and intellectually rigorous, and character focused, and grounded in faith.”

While thanking the many donors who have contributed to construction of the Hall, Fr. Poorman extended special gratitude to the Dundon-Berchtolds for moving the university “from a conversation phase to a happening phase.” And he noted that the university was proud to name the building in honor of them and their generous commitment.

Dundon-Berchtold Hall will provide much needed academic space for the campus. As the student population at the university has grown 30 percent over the past decade, classroom space has remained the same. Many of the classrooms in the hall will be designed for interactive learning, with spaces that are equipped with moveable furniture and updated technology. Other “cluster” classrooms will be used for small groups of students to work cooperatively and collaboratively together on projects and assignments, a core requirement of many university courses across all disciplines.

Dundon-Berchtold Hall is set for completion in January 2019.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.