Keeping Entrances Clean and Safe

Keeping your buildings clean and safe can be a challenge; utilizing a functional entrance flooring product at your entrances can make all the difference. This durable product is designed to protect entrances throughout a building, is located where building users frequently enter and exit, and is made from materials like aluminum or stainless steel.

Entrance flooring is designed to maintain a clean, safe entryway. As foot traffic enters the building, debris fall between the rails into the recessed area below. Trapping debris maintains surface traction and reduces slip/fall risks, especially in soggy conditions. To clean and maintain, facility crews simply roll back or lift the system to vacuum debris from the recessed area. This shortens cleaning time and creates a safer walkway. Because entrance flooring can either be recessed or surface-mounted, there is less risk for the product to dislodge and pose an additional threat.

An educational facility can encounter thousands of students and faculty each day. It could also see heavy machinery like scissor lifts, dollies, or vending machines. It is important to select entrance flooring that is proven to withstand heavy rolling loads and continual foot traffic. Many manufacturers have testing criteria available to help you to select the best option for your buildings. Rolling loads capabilities vary by product, ranging from 250 to 1,000 pounds per wheel.

Installing a permanent entrance flooring system keeps your building clean and safe by trapping dirt and debris, reducing the risk of slip/fall accidents, and standing up to heavy rolling loads. Remember to side with a manufacturer that has trustworthy products and services to ensure safety and durability.

This article originally appeared in the issue of .

About the Author

Wade Brown, LEED-AP, CDT, is the senior manager–Product Marketing for Construction Specialties (www.c-sgroup.com). He can be reached at [email protected] or 800/233-8493.

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.