Residence Hall Planned at Duke University

Skanska USA has signed a contract with Duke University to build the Hollows Residence Hall on the school’s West Campus in Durham, NC. The 264,700-square-foot residence hall will consist of two six-story buildings, adjacent to each other with a connecting portal, that will house about 500 students and resident assistants in suite-style dormitories.

Duke University Hollows Residence Hall

Each building will be organized into nine houses, featuring 30-60 beds in each house. The houses will include suites with four single bedrooms, along with in-suite bathrooms with separate vanities and kitchenette space. The buildings will also include a series of common lounges with full kitchens and dedicated study rooms. There will be nine rooms for resident assistants and one apartment each for a graduate resident and a residential coordinator. Some rooms will be compliant with the Americans with Disabilities Act and include space for an attendant.

“This project continues our longstanding relationship with Duke University and supports the university’s efforts to enhance the living and educational experience of its students,” says Greg Peele, general manager/executive vice president responsible for Skanska’s North Carolina/Virginia building operations. “The Hollows Residence Hall will meet students’ request for suite-style living in a modern building that successfully blends into the existing classic campus setting.”

The new facility will replace older buildings currently located on the Central Campus. The new residence hall’s architecture will take into consideration the adjacent residence halls and use a combination of the Duke Brick Blend with slate gabled roofs and the unique topography of the site. The suite-style configuration is being deployed in response in part to input from students via forums held in conjunction with the university and the project’s architects.

The site is on the north side of Towerview Drive, adjacent to Edens and Keohane Quads in an area bounded by the Wannamaker Residence, Duke University Road, and Edens Drive.

The residence hall project will be seeking LEED Silver certification. William Rawn Architects designed the residence hall. Construction is ongoing, and the project is expected to be completed by July 2019.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.