Groundbreakings Kick Off School Projects for Texas ISD

Belton, Texas — This week teachers, students and administrators held a groundbreaking to celebrate the start of construction for the new Charter Oak Elementary School. When completed for the 2019 start of classes, the new 82,300 SF Charter Oak Elementary School will have capacity for 800 students.

The new school will be a flexible and adaptable 21st century learning environment, based on the building program developed through the collaboration between Belton ISD and O’Connell Robertson. In addition to general and special education classrooms, students will enjoy specialty flex classrooms that offer art, music and computer stations.

Charter Oak was selected as the name to commemorate a historic event in Belton history, where, under a live oak tree, Bell County held its first election in 1850. The live oak tree still exists today, not far from the new school location, near Poison Oak Road in Temple, Texas.

Belton ISD has been identified as a fast growth school district; the projects are part of their Roadmap to BISD 2025, a 10-year facilities master plan to provide capacity for growth through 2025. "Belton ISD has grown by over 3,500 students in the last decade’,” said Dr. Susan Kincannon, Belton ISD Superintendent.

“In the last 20 years, our student enrollment has doubled. By 2025, we will have nearly 15,000 students in our schools.  Planning is essential to our ability to keep pace with the fast growth of our district. O’Connell Robertson’s team has worked side by side with the District to study and develop plans to address our facility needs.”

Earlier this month, Belton ISD held another groundbreaking to mark expansions to Lakewood Elementary School, which will include music classrooms and a new gymnasium. The projects at Lakewood ES are expected to be complete by July 2018. O’Connell Robertson provided architecture, MEP engineering and interior design services for both projects.

Featured

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.