Formaldehyde Voluntary Consensus Standards Final Rule

Washington, D.C. – EPA is publishing a final rule to update several voluntary consensus standards listed at 40 CFR § 770.99 and incorporated by reference in the Formaldehyde Emission Standards for Composite Wood Products rule. Read a prepublication copy of the voluntary consensus standards final rule here.

The final rule updates apply to emissions testing methods and regulated composite wood product construction characteristics. Several of those voluntary consensus standards (i.e., technical specifications for products or processes developed by standard-setting bodies) were updated, withdrawn, and/or superseded through the normal course of business by these bodies to take into account new information, technology, and methodologies.

Additionally, the final rule amends the rule at 40 CFR § 770.20(b) by allowing the formaldehyde emissions mill quality control test methods to correlate to either the ASTM E1333-14 test method or, upon a showing of equivalence, the ASTM D6007-14 test method. The correction aligns the mill quality control testing requirements with the California Air Resources Board standards allowing mill quality control tests to be correlated to the more commonly used ASTM D6007-14 test method. The final rule also clarifies that test data generated beginning December 12, 2016 may be used to establish the required annual equivalence and correlation until new annual equivalence and correlations are required. Beginning on the publication date of the final rule, new data used to establish annual equivalence and correlations must be generated using the updated test methods and standards referenced in this final rule.

EPA withdrew the earlier direct final rule issued on October 25, 2017 because the Agency received an adverse comment on the rulemaking. Today’s final rule considered all of the comments received during the proposed rule’s comment period.  Also note that on September 25, 2017, EPA issued a final rule to extend the compliance dates for the December 12, 2016 final Formaldehyde Emission Standards for Composite Wood Products Rule. Read more here.

Featured

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • University of Pennsylvania Releases Design of Future Physical Sciences Building

    The University of Pennsylvania (Penn) in Philadelphia, Penn., recently released renderings of an upcoming 350,000-square-foot Physical Sciences Building, according to news release. The facility was designed by CO Architects and will unite the university’s departments of Physics and Astronomy, Mathematics, and Earth and Environmental Science.

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.