Project Snapshot

PROJECT: Classroom Retrofits
INSTITUTION: Université de Saint-Boniface
LOCATION: Winnipeg, Manitoba, Canada
COMPANY NAME: Connectrac
WEBSITE: www.connectrac.com

Universite de Saint-Boniface

The Université de Saint-Boniface is recognized for its integrated approach that prepares students for higher learning and the workforce. Access to and use of technology is vital to the university’s mission. The flexibility of Connectrac’s wireway installation has contributed to successfully providing the access students need.

THE CHALLENGE

Each school year, the Université de Saint-Boniface in Winnipeg, Manitoba, Canada, retrofits a few classrooms to create a more active learning environment. This summer, the university renovated their IT classrooms to provide power and data capabilities to student desks as well as the instructor lectern. For IT classes, technology access was a must.

“We needed LAN and power connectivity for student computers, USB outlets for their laptops, as well as an effective wire management solution for the instructor’s desk,” says Robert Simard, director of Facilities and Security at the university. “Quite a bit of wiring goes into the professor’s area. We were looking for a clean solution.”

THE SOLUTION

Universite de Saint-BonifaceAfter seeing the Connectrac In-Carpet option in an issue of CFM&D magazine, Simard and the project team ordered and installed the product into their classrooms. The wireways went under the student desks to provide power, LAN, and USB capabilities for each table which was then distributed to the students station via a under table wire management system. Subsequently, the instructor lecterns in each classroom received power and data access, ensuring the connections they needed.

IMPACT ON LEARNING

For the university, the greatest benefit of using Connectrac is the wireway’s flexibility to be moved or reconfigured if and when future changes come along to the classroom. Given today’s rapidly changing learning environment, “We wanted to be able to move things around if we need to,” Simard says. “With Connectrac, we know we can make different configurations if we need to. The ability to transform the classroom quickly and efficiently is something we’re really seeking.”

The classrooms have been put into service, the school year has started off smoothly so far at the Université de Saint-Boniface, and future Connectrac installations are in store for future renovations.

Editor’s Review

Research into the benefits of technology in academic settings has shown technology—when implemented properly—can produce significant gains in student achievement and boost engagement. Technology supports student collaboration and allows instructors to design how material is presented in the classroom. This project benefits students, instructors, and the university itself by allowing for streamlined, configurable access to power and data.

This article originally appeared in the College Planning & Management March 2018 issue of Spaces4Learning.

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

Digital Edition