Miami University

Project Snapshot

PROJECT: Student Center
INSTITUTION: Miami University
LOCATION: Oxford, OH
COMPANY NAME: Armstrong Ceiling Systems
WEBSITE: armstrong.com/metalworks

Miami University

The Armstrong Student Center on the campus of Miami University enhances student learning through opportunities for community and campus engagement and serves as a safe and inclusive gathering place for students, faculty, staff, alumni, and guests.

THE CHALLENGE

The Armstrong Student Center at Miami University of Ohio is designed to provide 16,000 students with a home of their own on campus. One of the signature spaces within the Student Center is The Commons, a dining and gathering place with tiered seating for more than 450 students. When designing the space, the design team wanted a ceiling that would create visual interest and control acoustics in the large, open space. “We wanted to create interest in a place where people wanted to be,” says design team member Samantha Delabar. “Acoustics was also important so we could keep the noise from bouncing around in the space.” Acoustics also played a role in the design of the Galleria, a long, two-story corridor adjacent to the dining area. Here the design team wanted a ceiling that would control noise in the busy walkway while reflecting light from the exterior windows back into the space.

THE SOLUTION

Miami UniversityIn both spaces, the design team addressed all these criteria with two unique designs from Armstrong® MetalWorks™ RH215 Faceted Custom Ceiling Systems. The design team chose a wave-shaped ribbon design for the 2,300-square-foot ceiling above the dining area. The wave-shaped ribbons were created by suspending rows of 12-inch by 56-inch white metal ceiling panels on a curved suspension system. Each wave is enclosed by field-cut pieces of white metal trim. For the 6,900-square-foot ceiling above the Galleria, the design team chose a barrel vault design. The vaulted ceiling was created by suspending 18-inch by 105-inch white metal ceiling panels on a curved suspension system above the corridor. “The curvilinear shape and reflectiveness of the vaulted white ceiling helps bounce the natural light from the windows back down into the space,” says Delabar.

IMPACT ON LEARNING

Perforated and backed with acoustical fleece, both custom ceiling systems have an NRC (Noise Reduction Coefficient) of 0.65, absorbing 65 percent of the sound that strikes them. “In spaces this large, where students gather and people walk back and forth, these metal ceilings provide the necessary acoustical control,” she adds.

Editor’s Review

The acoustic performance of learning areas has a direct impact on the usability of the space. As educational spaces increasingly become more open, they also need to be designed and built to have high acoustic performance. By paying careful attention to the ceiling installation in the Armstrong Student Center, Miami University has successfully provided students with a facility with comfortable acoustics, resulting in a popular gathering place on campus.

This article originally appeared in the College Planning & Management March 2018 issue of Spaces4Learning.

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition